Skip Navigation Links | |
Exit Print View | |
Oracle Identity Synchronization for Windows 6.0 Deployment Planning Guide |
2. Case Study: Deploying in a Multimaster Replication Environment
3. Case Study: Deploying in a High-Availability Environment Over a Wide Area Network Using SSL
Global Telco Deployment Information
Installation and Configuration Overview
Primary and Secondary Installations
Periodically Linking New Users
Large Deployment Considerations
Increasing Connector Worker Threads
Aligning Primary and Failover Configurations
Setting Multiple Passwords for uid=PSWConnector
Initial idsync resync Operation
Initial idsync resync Operation for Primary Installation
Initial idsync resync Operation for Failover Installation
Periodic idsync resync Operations
Periodic idsync resync Operation for Primary Installation
Periodic idsync resync Operation for Failover Installation
Understanding the Failover Process
Initializing the Connector State
Failover Installation Maintenance
Stopping Synchronization at the Primary Installation
Starting Synchronization at the Failover Installation
Re-enabling the Directory Server Plugins
Changing the PDC FSMO Role Owner
Failing Back to the Primary installation
A. Pluggable Authentication Modules
B. Identity Manager and Identity Synchronization for Windows Cohabitation
For details on configuring the Sun Java System Identity Manager to coexist with Identity Synchronization for Windows, see Failing Back to the Primary installation.