JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Sun Server X2-8 Product Documentation     Sun Server X2-8 (formerly Sun Fire X4800 M2) Documentation Library
search filter icon
search icon

Document Information

Using This Documentation

Hardware Installation

Installing the Server in the Rack Using the Universal Rack Mounting Kit

Tools and Staff Required

Installing Optional Equipment

Compatible Racks

Contents of the Universal Rack Mounting Kit

Installing the Server in a Rack Using the Universal Rack Mounting Kit

How to Remove Components to Reduce Weight

How to Replace the Components in the Server

How to Install the Universal Rack Mounting Hardware in a Square-Hole Rack

How to Install the Universal Rack Mounting Hardware in a Round-Hole Rack

How to Insert the Server Into the Rack

Installing and Removing the Universal Shipping Brackets

How to Install the Universal Shipping Brackets

How to Remove the Universal Shipping Brackets

Operating System Installation

Administration, Diagnostics, and Service

Index

Tools and Staff Required


Caution

Caution - The server weighs about 180 pounds (100 kg) when fully loaded with components. To reduce the risk of serious personal injury or equipment damage, use a mechanical lift to install the server into the rack. If a lift is not available, remove components as described in How to Remove Components to Reduce Weight. This reduces the weight of the server to 80 pounds (45 kg).

Always load equipment into a rack from the bottom up so that it does not become top-heavy and tip over. Deploy your rack’s anti-tilt bar to prevent the rack from tipping during equipment installation.


Before installing the server into a rack, gather the tools, equipment, and staff required.

Tools, Equipment, and Staffing Required
Notes
Two trained staff
Two people are needed to install the server and operate the lift.
No. 2 10-inch Phillips screwdriver (magnetic tip recommended)
Mechanical lift
Strongly recommended. If not available, reduce the weight of the server. See How to Remove Components to Reduce Weight.
Compatible rack
Rack mounting kit
Shipping brackets
See Installing and Removing the Universal Shipping Brackets.
  • You must remove the shipping brackets if your server was shipped in a rack.

  • You must install the shipping brackets if you plan to ship your server in a rack.