Index
B C D E F G H I L M N O P R S T V W
B
- Base Configuration, 4.1.1, 5.10.1
- Biennial Tasks, A.9.4
C
- Capacity, 5.10.2
- Cleaning Activity, A.3.6
- CLINK Connectivity, 6.4.3
- Configuration Planning, 4
- Configuration Planning Overview, 4.2
- Contaminant Effects, A.4
- Contaminant Properties and Sources, A.3
- Controlling Contaminants, A
- Corrosive Failure, A.4.2
- Creating Planning Teams, 2.2
D
- Data Center Safety, 5.5
- Define the ippath, 6.4.2
- Define the Replication Ports, 6.4.1
- Dimensions, 5.10.3
- Dual Independent Source Power Supplies, 5.6.3
E
- Electrical Noise, 5.6.4
- Elevator Lifting Capacities, 5.4.2
- Emergency Power Control, 5.5.1
- Environmental Contaminants, A.1
- Environmental Requirements and Hazards, 5.8
- Environmental Specifications, 5.10
- Ethernet Port Assignments, 6.1
- Exposure Points, A.6
F
- FICON Port Assignments, 7.2
- Filtration, A.7
- Fire Prevention Guidelines, 5.5.2
- Floor Construction Requirements, 5.9
- Floor Loading Requirements, 5.9.1
- Floor Loading Specifications and References, 5.9.2
- Floor-Load Ratings, 5.4.3
G
- Grounding
-
- B-Series Equipment, 5.6.1
H
- HVAC, 5.10.7
- HVAC Requirements, 5.7
I
- Implementation Planning, 3
- Implementation Planning Goals, 3.1
- Implementation Planning Process Overview, 3.2
- Input Power Requirements, 5.6.2
- IP Connectivity Examples, 6.4
L
- Long Wave SFPs, 4.1.3
M
- MVS Host Software Requirements, 3.4
N
- Network Infrastructure Requirements, 3.3
O
- Operator Activity, A.3.1
- Outside Air, A.3.3
- Outside Influences, A.3.5
P
- Physical Site Readiness Planning, 5
- Planning Activities, 2.3
- Planning and Implementation Overview, 2
- Planning Goals, 2.1
- Planning Spreadsheet, 2.4
- Planning Teams, 2.2
- Power, 5.10.6
- Power Distribution Systems, 5.6
- Product Introduction, 1
- Product Overview, 1
R
- Raised-Floor Lateral Stability Ratings, 5.9.3
- Raised-Floor Panel Ratings, 5.9.4
- Raised-Floor Pedestal Ratings, 5.9.5
- Ramp Inclines, 5.4.3
- Replication Ports, Define, 6.4.1
- Room Conditions, A.5
- RTD Connectivity Examples, 7.3
S
- Service Clearance, 5.10.4
- Serviceability Requirements, 3.5
- SFPs, 4.1.3
- Short Wave SFPs, 4.1.3
- Shorts, A.4.3
- Site Power Distribution Systems, 5.6
- Site Readiness Planning, 5
- Site Readiness Planning Process, 5.1
- Static Electricity, 5.6.5
- Storage Capacity Upgrade, 4.1.2
- Stored Items, A.3.4
- Structural Dimensions and Obstructions, 5.4.1
T
- The VSM Solution, 1.1
- Thermal Failure, A.4.4
- Transferring Equipment Point-to-Point, 5.4
V
- VLE Connectivity, 6.4.2
- VSM 6 Base Configuration, 4.1.1
- VSM 6 Base Unit, 4.1.1, 5.10.1
- VSM 6 Platform, 1.2
- VSM 6 Product Overview, 1
- VSM Solution, 1.1
W
- Weight, 5.10.5