This figure shows the required task order for the two server upgrade method. In this method, the upgrade tasks are not performed in numerical order. You must complete the tasks in the order below. Task 7 is omitted.

  1. Task 1 — Record 1.0.x Settings

  2. Task 4 — Install Linux 6.x (STA Server #2)

  3. Task 5 — Install STA 2.0 (STA Server #2)

  4. Task 6 — Dump New 2.0 Database (STA Server #2)

  5. Task 2 — Dump 1.0.x Database (STA Server #1)

  6. Task 3 — Transfer 1.0.x Database (STA Server #1 to STA Server #2)

  7. Task 8 — Process/load 1.0.x Database (STA Server #2)

  8. Task 9 — Upgrade Database (STA Server #2)

  9. Task 10 — Configure STA 2.0