Siebel Energy Guide > Premises in Siebel Energy >
Replacing a Meter for Maintenance (End User)
A malfunctioning meter can be removed from service and replaced with one that works correctly. The original meter can then be repaired and installed at another location. When a meter is removed or installed, the field service administrator must update Siebel Energy so the locations of meters owned by the company can be tracked. To record the date that a meter was removed
- Navigate to the Administration - Data screen, then the Premises view.
- Click the Meter Location view tab.
- In the Meter Location form, select a location record.
- In the End Date field, select the date and time when the meter is removed.
|