Navigation:
Identifies the unique name of a scheduled operation, which is an action that the Oracle FS System performs at the specified time or at regular intervals.
Allows you to assign the clone volume to an existing volume group.
Indicates that the scheduled operation performs at the specified time.
Indicates that the operation is not performed as scheduled.
Identifies the name of the logical volume from which the scheduled clone is created.
Identifies the number of child Clone LUNs associated with the existing LUN.
Displays the amount of space allocated for Clone LUNs.
Displays the maximum space allocated for Clone LUNs.
Identifies the date and time that the schedule begins.
Indicates that the replication runs immediately and only one time.
Identifies how often the system performs the scheduled replication operation.
Interval | Frequency |
---|---|
1 through 7 | Days |
1 through 24 | Hours |
1 through 24 | Months |
1 though 52 | Weeks |
When selecting a weekly schedule, select the days of the week on which the replication occurs.