View a Project CBS
get
/api/restapi/cbs/projectCbs/{cbsSheetCodeId}
This endpoint returns Project CBS code that meet the following requirements:
- The object has an ID that matches the value of the {cbsSheetCodeId} path parameter.
Request
Path Parameters
-
cbsSheetCodeId(required): integer(int64)
The system-generated identifier of a CBS.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
200 Response
Returns the project CBS for the specified project CBS ID
Root Schema : ApiEntityCBSSheetCode
Type:
object
Title:
Show Source
ApiEntityCBSSheetCode
-
cbsCode(required): string
Minimum Length:
1
Maximum Length:60
The cost breakdown structure code is a code that is concatenated with its parent and child according to the segment definition. -
cbsSheetCodeId: integer
(int64)
The ID of the cost breakdown structure code. The CBS code is a code that is concatenated with its parent and child according to the segment definition. This value should not be provided in create operation request data, however, it is required for update requests.
-
copiedFromItem: integer
(int64)
The unique identifier for the original ID.
-
costSheetId: integer
(int64)
The unique identifier of a cost sheet.
-
costSheetRow:
costSheetRow
A CBS sheet row object.
-
costSheetRowCost:
costSheetRowCost
The cost of a CBS sheet row.
-
costType: string
Allowed Values:
[ "CAPITAL", "EXPENSE", "NONE" ]
The category of the cost breakdown structure code.
Expense: Represents an expense.
Capital: Represents capital.
None: Type is not divided into expense or capital. None is selected by default if no other choice is made. -
description: string
Minimum Length:
0
Maximum Length:255
The name of the CBS code. -
isActive: boolean
The active field indicates whether the CBS code is active for use.
-
isTotalRow: boolean
Indicates this item represents the total cost of the project.
-
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
parentCBSCodes: array
parentCBSCodes
List of parent cbs codes in a hierarchy. This field is not populated as part of the API response since it is a write-only field, used only for the create or update APIs.
-
parentId: integer
(int64)
The system-generated identifier of a parent cost item in a cost sheet.
-
projectCode: string
Minimum Length:
1
Maximum Length:60
The user-specified identifier of a project. -
projectId: integer
(int64)
The unique identifier for the project.
-
sequenceNumber: integer
(int32)
Number that specifies the position of the cost sheet item.
-
sourceId: string
Maximum Length:
255
The unique identifier of cost sheet item data in an external source. -
updateDate: string
(date-time)
Date when the record was last updated.
-
workspaceCode: string
Minimum Length:
0
Maximum Length:60
The user-specified identifier of a workspace. -
workspaceId: integer
(int64)
The system-generated identifier of a workspace.
Nested Schema : costSheetRow
A CBS sheet row object.
Match All
Show Source
-
object
ApiEntityCBSSheetRow
Title:
ApiEntityCBSSheetRow
Nested Schema : costSheetRowCost
The cost of a CBS sheet row.
Match All
Show Source
-
object
ApiEntityCBSSheetRowCost
Title:
ApiEntityCBSSheetRowCost
Read Only:true
Nested Schema : parentCBSCodes
Type:
array
List of parent cbs codes in a hierarchy. This field is not populated as part of the API response since it is a write-only field, used only for the create or update APIs.
Show Source
Nested Schema : ApiEntityCBSSheetRow
Type:
object
Title:
Show Source
ApiEntityCBSSheetRow
-
actualHoursToDate: number
(double)
The actual hours spent on the scope assignment. This tracks the VOWD (Value of Work Done).
This is the cumulative value for all objects in the project with the same CBS code. -
approvedChangedHours: number
(double)
The sum of all approved change hours in the change and transfer records for the scope assignment.
This is the cumulative value for all objects in the project with the same CBS code. -
atCompletionHours: number
(double)
The total hours expected for the scope assignment.
Calculated as Revised Hours plus Adjusted Hours.
This is the cumulative value for all objects in the project with the same CBS code. -
bacHours: number
(double)
The Revised Hours or At Completion Hours at the time the current baseline was set, depending on the selection for the Budget At Completion Method. The Revised Hours of the current project if no baseline is set.
This is the cumulative value for all objects in the project with the same CBS code. -
baselineHours: number
(double)
The Revised Hours at the time the baseline was set.
This is the cumulative value for all objects in the project with the same CBS code. -
cbsSheetCodeId: integer
(int64)
The CBS code assigned to the line item.
-
configuredFields: array
configuredFields
An object containing configured fields in the form of key-value pairs.
-
eacHours: number
(double)
Calculated as ETC Hours plus Actual Hours to Date.
This is the cumulative value for all objects in the project with the same CBS code. -
earnedHours: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Hours.
This is the cumulative value for all objects in the project with the same CBS code. -
etcAdjustedHours: number
(double)
The amount of scope assignment work that is not yet accounted for. For example, you might enter a value to represent pending change requests that are likely to be approved.
This is the cumulative value for all objects in the project with the same CBS code. -
etcHours: number
(double)
The estimated number of hours needed to complete the work.
Calculated as BAC Hours minus Earned Hours.
This is the cumulative value for all objects in the project with the same CBS code. -
installedHours: number
(double)
Hours spent on the scope assignment.
Calculated as Installed Quantity multiplied by Revised Productivity Rate.
This is the cumulative value for all objects in the project with the same CBS code. -
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
pendingChangedHours: number
(double)
Calculated as the sum of all pending hour changes in the change records for the scope assignment.
This is the cumulative value for all objects in the project with the same CBS code. -
plannedHours: number
(double)
The original expected hours needed to complete all the work required to install the material quantity on the scope assignment.
Calculated as Original Quantity multiplied by Original Productivity Rate.
Before the baseline is set, this field can be entered manually. A manual entry recalculates the Original Productivity Rate to equal Original Hours divided by Original Quantity.
This is the cumulative value for all objects in the project with the same CBS code. -
projectActualHours: number
(double)
The actual hours spent on the scope assignment. This tracks the VOWD (Value of Work Done).
-
projectEarnedHours: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Hours.
-
projectHPI: number
(double)
Calculated as the total of Project Earned Hours divided by Project Actual Hours.
-
remainingHours: number
(double)
The number of hours left for the scope assignment.
Calculated as Remaining Quantity multiplied by Revised Productivity Rate.
This is the cumulative value for all objects in the project with the same CBS code. -
revisedHours: number
(double)
Original Hours before the baseline is set. After the baseline is set, Revised Hours is equal to Original Hours plus Approved Change Hours.
This is the cumulative value for all objects in the project with the same CBS code. -
updateDate: string
(date-time)
Date when the record was last updated.
Nested Schema : configuredFields
Type:
array
An object containing configured fields in the form of key-value pairs.
Show Source
-
Array of:
object ApiEntityCBSSheetRowConfiguredFieldValue
Title:
ApiEntityCBSSheetRowConfiguredFieldValue
Nested Schema : ApiEntityCBSSheetRowConfiguredFieldValue
Type:
object
Title:
Show Source
ApiEntityCBSSheetRowConfiguredFieldValue
-
action: string
Allowed Values:
[ "DELETE" ]
Provide value for this field during object update to delete the assigned configured field value. -
columnDefinitionId: integer
(int64)
Unique identifier of the column. This value should not be provided in create operation request data, however, it is required for update requests.
-
columnLabel: string
Minimum Length:
1
Maximum Length:100
The user-specified UDF column label. -
columnName: string
Minimum Length:
1
Maximum Length:100
The user-specified UDF column name. -
costSheetRowConfiguredFieldValueId: integer
(int64)
The unique identifier for the Project Cost Sheet Configured Field.
-
costSheetRowId: integer
(int64)
The system-generated identifier of a CBS Code.
-
costValue: number
This holds values for Cost type configured fields in the base currency conversion. Input should be provided in numberValue field, in currency of record.
-
costValueWorkspace1: number
(double)
This holds values for Cost type configured fields in the workspace1 currency conversion.
-
costValueWorkspace2: number
(double)
This holds values for Cost type configured fields in the workspace2 currency conversion.
-
costValueWorkspace3: number
(double)
This holds values for Cost type configured fields in the workspace3 currency conversion.
-
dateValue: string
(date-time)
This holds values for Date type configured fields.
-
exceptionMessage: string
Maximum Length:
4000
Provides the error message for why the formula calculation resulted in an error. -
hasException: boolean
Determines if formula calculation hit an error calculating a value for this field.
-
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
numberValue: number
This holds values for Number, Integer and Cost type configured fields. Input for the cost configured field should be provided in the currency of record. For example project level currency in case of Activity, base currency for Company, workspace currency for Funds and record level currency for Project Actuals etc. configured fields.
-
textValue: string
Maximum Length:
4000
This holds values for Boolean, List and Text type configured fields. -
updateDate: string
(date-time)
Date when the record was last updated.
Nested Schema : ApiEntityCBSSheetRowCost
Type:
object
Title:
ApiEntityCBSSheetRowCost
Read Only:
Show Source
true
-
actualCostToDate: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). This field is in base currency and is calculated from actualCostToDateProject field based on the specified exchange rate.
-
actualCostToDateProject: number
(double)
The actual cost to date of a project. This value is based on the project currency.
-
actualCostToDateWorkspace1: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). Calculated based on the workspace currency.
-
actualCostToDateWorkspace2: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). Calculated based on the workspace currency.
-
actualCostToDateWorkspace3: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). Calculated based on the workspace currency.
-
actualRiskResponse: number
(double)
The actual cost of implementing the response action. This field is in base currency and is calculated from actualRiskResponseProject field based on the specified exchange rate.
-
actualRiskResponseProject: number
(double)
The pending manual budget of a project. This value is based on the project currency.
-
actualRiskResponseWorkspace1: number
(double)
The actual cost of implementing a response action for a workspace.
-
actualRiskResponseWorkspace2: number
(double)
The actual cost of implementing a response action for a workspace.
-
actualRiskResponseWorkspace3: number
(double)
The actual cost of implementing a response action for a workspace.
-
adjustedCost: number
(double)
The amount the scope assignment work that is not yet accounted for. For example, you might enter a value to represent pending change requests that are likely to be approved. This field is in base currency and is calculated from adjustedCostProject field based on the specified exchange rate.
-
adjustedCostProject: number
(double)
The adjusted cost of a project. This value is based on the project currency.
-
adjustedCostWorkspace1: number
(double)
The amount the scope assignment work that is not yet accounted for, calculated based on the workspace currency.
-
adjustedCostWorkspace2: number
(double)
The amount the scope assignment work that is not yet accounted for, calculated based on the workspace currency.
-
adjustedCostWorkspace3: number
(double)
The amount the scope assignment work that is not yet accounted for, calculated based on the workspace currency.
-
approvedChangedCost: number
(double)
The sum of all approved cost changes in the change records for the scope assignment. This field is in base currency and is calculated from approvedChangedCostProject field based on the specified exchange rate.
-
approvedChangedCostProject: number
(double)
The approved changed cost of a project. This value is based on the project currency.
-
approvedChangedCostWorkspace1: number
(double)
The sum of all approved cost changes in the change records for the scope assignment. Calculated based on the workspace currency.
-
approvedChangedCostWorkspace2: number
(double)
The sum of all approved cost changes in the change records for the scope assignment. Calculated based on the workspace currency.
-
approvedChangedCostWorkspace3: number
(double)
The sum of all approved cost changes in the change records for the scope assignment. Calculated based on the workspace currency.
-
approvedManualBudget: number
(double)
Calculated as the sum of all costs approved for the original manual budget. This field is in base currency and is calculated from approvedManualBudgetProject field based on the specified exchange rate.
-
approvedManualBudgetChanges: number
(double)
The total approved current manual budget of a project. Calculated as the sum of Approved Original Manual Budget plus Approved Manual Budget Changes plus Approved Manual Budget Transfers. This field is in base currency and is calculated from approvedManualBudgetChangesProject field based on the specified exchange rate.
-
approvedManualBudgetChangesProject: number
(double)
Approved manual budget changes of a project. This value is based on the project currency.
-
approvedManualBudgetChangesWorkspace1: number
(double)
Approved manual budget changes of a workspace.
-
approvedManualBudgetChangesWorkspace2: number
(double)
Approved manual budget changes of a workspace.
-
approvedManualBudgetChangesWorkspace3: number
(double)
Approved manual budget changes of a workspace.
-
approvedManualBudgetProject: number
(double)
Calculated as the sum of all costs approved for the manual budget. This value is based on the project currency.
-
approvedManualBudgetTransfers: number
(double)
Calculated as the sum of all approved manual budget transfers for the project. This field is in base currency and is calculated from approvedManualBudgetTransfersProject field based on the specified exchange rate.
-
approvedManualBudgetTransfersProject: number
(double)
Approved manual budget transfers of a project. This value is based on the project currency.
-
approvedManualBudgetTransfersWorkspace1: number
(double)
Approved manual budget transfers of a workspace.
-
approvedManualBudgetTransfersWorkspace2: number
(double)
Approved manual budget transfers of a workspace.
-
approvedManualBudgetTransfersWorkspace3: number
(double)
Approved manual budget transfers of a workspace.
-
approvedManualBudgetWorkspace1: number
(double)
Calculated as the sum of all costs approved for the manual budget.
-
approvedManualBudgetWorkspace2: number
(double)
Calculated as the sum of all costs approved for the manual budget.
-
approvedManualBudgetWorkspace3: number
(double)
Calculated as the sum of all costs approved for the manual budget.
-
approvedManualCurrentBudget: number
(double)
The total approved current manual budget of a project. Calculated as the sum of Approved Original Manual Budget plus Approved Manual Budget Changes plus Approved Manual Budget Transfers. This field is in base currency and is calculated from approvedManualCurrentBudgetProject field based on the specified exchange rate.
-
approvedManualCurrentBudgetProject: number
(double)
Approved manual current budget of a project. This value is based on the project currency.
-
approvedManualCurrentBudgetWorkspace1: number
(double)
Approved manual current budget of a workspace.
-
approvedManualCurrentBudgetWorkspace2: number
(double)
Approved manual current budget of a workspace.
-
approvedManualCurrentBudgetWorkspace3: number
(double)
Approved manual current budget of a workspace.
-
approvedProjectActuals: number
(double)
The total amount of confirmed actuals. This field is in base currency and is calculated from approvedProjectActualsProject field based on the specified exchange rate.
-
approvedProjectActualsProject: number
(double)
The total amount of confirmed actuals for a project. This value is based on the project currency.
-
approvedProjectActualsWorkspace1: number
(double)
The total amount of confirmed actuals for a workspace.
-
approvedProjectActualsWorkspace2: number
(double)
The total amount of confirmed actuals for a workspace.
-
approvedProjectActualsWorkspace3: number
(double)
The total amount of confirmed actuals for a workspace.
-
atCompletionCost: number
(double)
The total cost at the completion of the scope assignment.
Calculated as Revised Cost plus Adjusted Cost. This field is in base currency and is calculated from atCompletionCostProject field based on the specified exchange rate. -
atCompletionCostProject: number
(double)
Calculated as the sum of actual costs plus remaining costs for the project. This value is based on the project currency.
-
atCompletionCostWorkspace1: number
(double)
The total cost at the completion of the scope assignment. Calculated based on the workspace currency.
-
atCompletionCostWorkspace2: number
(double)
The total cost at the completion of the scope assignment. Calculated based on the workspace currency.
-
atCompletionCostWorkspace3: number
(double)
The total cost at the completion of the scope assignment. Calculated based on the workspace currency.
-
bacCost: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. The Revised Cost of the current project if no baseline is set. This field is in base currency and is calculated from bacCostProject field based on the specified exchange rate.
-
bacCostProject: number
(double)
The BAC cost of a project. This value is based on the project currency.
-
bacCostWorkspace1: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. Calculated based on the workspace currency.
-
bacCostWorkspace2: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. Calculated based on the workspace currency.
-
bacCostWorkspace3: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. Calculated based on the workspace currency.
-
baselineCost: number
(double)
The Revised Cost at the time the current baseline was set. This field is in base currency and is calculated from baselineCostProject field based on the specified exchange rate.
-
baselineCostProject: number
(double)
The baseline cost of a project. This value is based on the project currency.
-
baselineCostWorkspace1: number
(double)
The Revised Cost at the time the current baseline was set. Calculated based on the workspace currency.
-
baselineCostWorkspace2: number
(double)
The Revised Cost at the time the current baseline was set. Calculated based on the workspace currency.
-
baselineCostWorkspace3: number
(double)
The Revised Cost at the time the current baseline was set. Calculated based on the workspace currency.
-
cbsSheetCodeId: integer
(int64)
The unique identifier of a cost row item.
-
closedPostExposure: number
(double)
The mean post-response probability of the risk multiplied by the mean post-response cost impact of the risk. This field is in base currency and is calculated from closedPostExposureProject field based on the specified exchange rate.
-
closedPostExposureProject: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response cost impact of the risk. This value is based on the project currency.
-
closedPostExposureWorkspace1: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response cost impact of the risk.
-
closedPostExposureWorkspace2: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response cost impact of the risk.
-
closedPostExposureWorkspace3: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response cost impact of the risk.
-
closedPreExposure: number
(double)
The mean pre-response probability of the risk multiplied by the mean pre-response cost impact of the risk. This field is in base currency and is calculated from closedPreExposureProject field based on the specified exchange rate.
-
closedPreExposureProject: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk. This value is based on the project currency.
-
closedPreExposureWorkspace1: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk.
-
closedPreExposureWorkspace2: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk.
-
closedPreExposureWorkspace3: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk.
-
currentBudget: number
(double)
The total approved current manual budget of a project. Calculated as the sum of Approved Original Manual Budget plus Approved Manual Budget Changes plus Approved Manual Budget Transfers. This field is in base currency and is calculated from currentBudgetProject field based on the specified exchange rate.
-
currentBudgetProject: number
(double)
Calculated as the sum of all current costs for the selected budget sources. Selected budget sources can include scope based budget and manual budget. This value is based on the project currency.
-
currentBudgetWorkspace1: number
(double)
Calculated as the sum of all current costs for the selected budget sources. Selected budget sources can include scope based budget and manual budget.
-
currentBudgetWorkspace2: number
(double)
Calculated as the sum of all current costs for the selected budget sources. Selected budget sources can include scope based budget and manual budget.
-
currentBudgetWorkspace3: number
(double)
Calculated as the sum of all current costs for the selected budget sources. Selected budget sources can include scope based budget and manual budget.
-
eacCost: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. This field is in base currency and is calculated from eacCostProject field based on the specified exchange rate.
-
eacCostProject: number
(double)
The EAC cost of a project. This value is based on the project currency.
-
eacCostWorkspace1: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. Calculated based on the workspace currency.
-
eacCostWorkspace2: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. Calculated based on the workspace currency.
-
eacCostWorkspace3: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. Calculated based on the workspace currency.
-
earnedCost: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost. This field is in base currency and is calculated from earnedCostProject field based on the specified exchange rate.
-
earnedCostProject: number
(double)
The earned cost of a project.
-
earnedCostWorkspace1: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost. Calculated based on the workspace currency.
-
earnedCostWorkspace2: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost. Calculated based on the workspace currency.
-
earnedCostWorkspace3: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost. Calculated based on the workspace currency.
-
etcCost: number
(double)
The estimate of the cost needed to complete the work.
Calculated as BAC Cost minus Earned Cost. This field is in base currency and is calculated from etcCostProject field based on the specified exchange rate. -
etcCostProject: number
(double)
The ETC cost of a project. This value is based on the project currency.
-
etcCostWorkspace1: number
(double)
The estimate of the cost needed to complete the work. Calculated based on the workspace currency.
-
etcCostWorkspace2: number
(double)
The estimate of the cost needed to complete the work. Calculated based on the workspace currency.
-
etcCostWorkspace3: number
(double)
The estimate of the cost needed to complete the work. Calculated based on the workspace currency.
-
installedCost: number
(double)
The total cost incurred on the scope assignment as of the current date.
If Rate By is set to Hours, then Installed Cost equals Revised Cost Rate multiplied by Installed Hours.
If Rate By is set to Quantity, then Installed Cost equals Revised Cost Rate multiplied by Installed Quantity. This field is in base currency and is calculated from installedCostProject field based on the specified exchange rate. -
installedCostProject: number
(double)
The installed cost of a project. This value is based on the project currency.
-
installedCostWorkspace1: number
(double)
The total cost incurred on the scope assignment as of the current date. Calculated based on the workspace currency.
-
installedCostWorkspace2: number
(double)
The total cost incurred on the scope assignment as of the current date. Calculated based on the workspace currency.
-
installedCostWorkspace3: number
(double)
The total cost incurred on the scope assignment as of the current date. Calculated based on the workspace currency.
-
link: string
(url)
Read Only:
true
The self-link to the object. This field is populated only in the responses generated by the batch create APIs. -
openPostExposure: number
(double)
The mean post-response probability of the risk multiplied by the mean post-response cost impact of the risk. This field is in base currency and is calculated from openPostExposureProject field based on the specified exchange rate.
-
openPostExposureProject: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk. This value is based on the project currency.
-
openPostExposureWorkspace1: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk.
-
openPostExposureWorkspace2: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk.
-
openPostExposureWorkspace3: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk.
-
openPreExposure: number
(double)
The mean pre-response probability of the risk multiplied by the mean pre-response cost impact of the risk. This field is in base currency and is calculated from openPreExposureProject field based on the specified exchange rate.
-
openPreExposureProject: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk. This value is based on the project currency.
-
openPreExposureWorkspace1: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk.
-
openPreExposureWorkspace2: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk.
-
openPreExposureWorkspace3: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk.
-
pendingChangedCost: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment. This field is in base currency and is calculated from pendingChangedCostProject field based on the specified exchange rate.
-
pendingChangedCostProject: number
(double)
The pending changed cost of a project. This value is based on the project currency.
-
pendingChangedCostWorkspace1: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment. Calculated based on the workspace currency.
-
pendingChangedCostWorkspace2: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment. Calculated based on the workspace currency.
-
pendingChangedCostWorkspace3: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment. Calculated based on the workspace currency.
-
pendingManualBudget: number
(double)
Calculated as the sum of all costs pending for the original manual budget. This field is in base currency and is calculated from pendingManualBudgetProject field based on the specified exchange rate.
-
pendingManualBudgetChanges: number
(double)
Calculated as the sum of all pending manual budget changes for the project. This field is in base currency and is calculated from pendingManualBudgetChangesProject field based on the specified exchange rate.
-
pendingManualBudgetChangesProject: number
(double)
Pending manual budget changes of a project. This value is based on the project currency.
-
pendingManualBudgetChangesWorkspace1: number
(double)
Pending manual budget changes of a workspace.
-
pendingManualBudgetChangesWorkspace2: number
(double)
Pending manual budget changes of a workspace.
-
pendingManualBudgetChangesWorkspace3: number
(double)
Pending manual budget changes of a workspace.
-
pendingManualBudgetProject: number
(double)
The pending manual cost of a project. This value is based on the project currency.
-
pendingManualBudgetTransfers: number
(double)
Calculated as the sum of all pending manual budget transfers for the project. This field is in base currency and is calculated from pendingManualBudgetTransfersProject field based on the specified exchange rate.
-
pendingManualBudgetTransfersProject: number
(double)
Pending manual budget transfers of a project. This value is based on the project currency.
-
pendingManualBudgetTransfersWorkspace1: number
(double)
Pending manual budget transfers of a workspace.
-
pendingManualBudgetTransfersWorkspace2: number
(double)
Pending manual budget transfers of a workspace.
-
pendingManualBudgetTransfersWorkspace3: number
(double)
Pending manual budget transfers of a workspace.
-
pendingManualBudgetWorkspace1: number
(double)
The pending manual budget of a workspace.
-
pendingManualBudgetWorkspace2: number
(double)
The pending manual budget of a workspace.
-
pendingManualBudgetWorkspace3: number
(double)
The pending manual cost of a workspace.
-
pendingProjectActuals: number
(double)
The total amount of pending actuals. This field is in base currency and is calculated from pendingProjectActualsProject field based on the specified exchange rate.
-
pendingProjectActualsProject: number
(double)
Total amount of pending actuals for a project. This value is based on the project currency.
-
pendingProjectActualsWorkspace1: number
(double)
Total amount of pending actuals for a workspace.
-
pendingProjectActualsWorkspace2: number
(double)
Total amount of pending actuals for a workspace.
-
pendingProjectActualsWorkspace3: number
(double)
Total amount of pending actuals for a workspace.
-
plannedCost: number
(double)
The original cost of the scope assignment.
If Rate By is set to Hours, then Original Cost equals Original Hours multiplied by Original Cost Rate. If this value is entered manually, then Original Cost Rate is recalculated to equal Original Cost divided by Original Hours.
If Rate By is set to Quantity, then Original Cost equals Original Quantity multiplied by Original Cost Rate. If this value is entered manually, then Original Cost Rate is recalculated to equal Original Cost divided by Original Quantity. This field is in base currency and is calculated from plannedCostProject field based on the specified exchange rate. -
plannedCostProject: number
(double)
The planned cost of a project. This value is based on the project currency.
-
plannedCostWorkspace1: number
(double)
The original cost of the scope assignment. Calculated based on the workspace currency.
-
plannedCostWorkspace2: number
(double)
The original cost of the scope assignment. Calculated based on the workspace currency.
-
plannedCostWorkspace3: number
(double)
The original cost of the scope assignment. Calculated based on the workspace currency.
-
plannedRiskResponse: number
(double)
The estimated cost associated with implementing the response action. This field is in base currency and is calculated from plannedRiskResponseProject field based on the specified exchange rate.
-
plannedRiskResponseProject: number
(double)
The actual cost of implementing a response action for a project. This value is based on the project currency.
-
plannedRiskResponseWorkspace1: number
(double)
The estimated cost associated with implementing the response action for the workspace.
-
plannedRiskResponseWorkspace2: number
(double)
The estimated cost associated with implementing the response action for the workspace.
-
plannedRiskResponseWorkspace3: number
(double)
The estimated cost associated with implementing the response action for the workspace.
-
projectActualCost: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This field is in base currency and is calculated from projectActualCostProject field based on the specified exchange rate. -
projectActualCostProject: number
(double)
Calculated as the sum of the amount of each actual line item for a project. This value is based on the project currency.
-
projectActualCostWorkspace1: number
(double)
Total costs accrued on a project within a given time period, calculated based on the workspace currency.
-
projectActualCostWorkspace2: number
(double)
Total costs accrued on a project within a given time period, calculated based on the workspace currency.
-
projectActualCostWorkspace3: number
(double)
Total costs accrued on a project within a given time period, calculated based on the workspace currency.
-
projectCPI: number
The measure of a project's cost efficiency.
A value of less than 1 indicates the project is over budget, while a value greater than 1 indicates the project is under budget. This field is in base currency and is calculated from projectCPIProject field based on the specified exchange rate. -
projectCPIProject: number
The CPI cost of a project. This value is based on the project currency.
-
projectEarnedCost: number
(double)
The value of work performed on a project in reference to the approved budget for the project.
The cost value used for the Earned Value Management of a project.
Earned Value Management allows project managers to quantify project progress and objectively measure a project's success. This field is in base currency and is calculated from projectEarnedCostProject field based on the specified exchange rate. -
projectEarnedCostProject: number
(double)
The earned cost of a project. This value is based on the project currency.
-
remainingCost: number
(double)
The amount left to be spent.
If Rate By set to Hours, then Remaining Cost equals Remaining Hours multiplied by Revised Cost Rate.
If Rate By set to Quantity, then Remaining Cost equals Remaining Quantity multiplied by Revised Cost Rate. This field is in base currency and is calculated from remainingCostProject field based on the specified exchange rate. -
remainingCostProject: number
(double)
The remaining total cost for the project, including labor resources, nonlabor resources, and project expenses. This value is based on the project currency.
-
remainingCostWorkspace1: number
(double)
The amount left to be spent. Calculated based on the workspace currency.
-
remainingCostWorkspace2: number
(double)
The amount left to be spent. Calculated based on the workspace currency.
-
remainingCostWorkspace3: number
(double)
The amount left to be spent. Calculated based on the workspace currency.
-
revisedCost: number
(double)
The Original Cost before the baseline is set. After the baseline is set, Revised Cost equals Original Cost plus Approved Change Cost. This field is in base currency and is calculated from revisedCostProject field based on the specified exchange rate.
-
revisedCostProject: number
(double)
The revised cost of a project. This value is based on the project currency.
-
revisedCostWorkspace1: number
(double)
The Original Cost before the baseline is set. Calculated based on the workspace currency.
-
revisedCostWorkspace2: number
(double)
The Original Cost before the baseline is set. Calculated based on the workspace currency.
-
revisedCostWorkspace3: number
(double)
The Original Cost before the baseline is set. Calculated based on the workspace currency.
-
updateDate: string
(date-time)
Read Only:
true
Date when the record was last updated.
404 Response
The requested object does not exist, or you do not have access to it.