Oracle® Communications EAGLE Commands Error Recovery Reference Release 46.8 F11879 Revision 1 |
|
![]() Previous |
![]() Next |
The command cannot be entered because another process is occuring. Table 2-3 shows the conditions and recovery procedures for the various commands that can generate this error message.
Table 2-3 Commands that cannot be entered because another process is running
Commands | Issue and Recovery |
---|---|
act/dact-ip-lnk |
No other action command can be in progress when this command is entered. Re-enter the command after all other action commands have completed. |
canc-cmd:trm= |
The command was entered on the same terminal that is running the command to be canceled.
|
rept-stat-xxxx |
No other Wait for all |
tst-imt |
A related IMT command cannot be in progress. Only one Fault Isolation Test or Extended Bit Rate Extenstion Test (BERT) can be active at a time. An Extended BERT cannot be performed if the Wait for all of the above commands or tests to complete, then re-enter the |
all other commands using this error | Heavy disk activity (e.g. database maintenance or measurement collection) may prevent access to the system. Action commands (used to change the state of entities within the system) cannot execute because another action command is in progress. For more information on action commands, refer to the Commands User's Guide.
|