This section covers the following:
- Get CBS Structure
- Create CBS Code
- Get CBS Codes
- Update CBS Codes
Note: The Cost Breakdown Structure (CBS) methods have replaced the Work Breakdown Structure (WBS) methods; however, for legacy purposes the initials "WBS" have remained as is (for example, WBSXML in the Create CBS Code method is the identifier used for the CBS creation XML format).