• Working with Earned Value Analysis
    • Prerequisite
    • Summary of Steps for Earned Value (EV) Analysis
    • Configuring the Gateway Integration
      • Role and Resource Rates
      • Activity and Assignment Data
      • Prerequisites for Configuring the Gateway Integration
    • Mapping P6 Projects in Shell Details
    • Master Rate Sheet
      • Master Rate Sheet and P6 (Multiple Row Rates)
      • Accessing the Master Rate Sheet Log
      • Master Rate Sheet Log: Toolbar Functions
      • Master Rate Sheet Log: Tabs
      • Opening Master Rate Sheet
      • Master Rate Sheet and Manual Activity Sheet
        • Creating Master Rate Sheet
        • Master Rate Sheet (View)
        • Adding Resources
        • Assigning Standard Rates, New Rates, and Rate Breakdowns
        • Master Rate Sheet Resource
        • Adding Roles Manually
        • Adding Standard Rates and Rate Breakdowns
        • Importing Resources, Roles, and Rate Breakdown
        • CSV Import for Role and Resource Rates
    • Activity Manager
      • Activity Sheet Sub-Node: Activity Sheets Log and System Activity Sheet
      • Activity Sheets Log and System Activity Sheet
      • Activity Sheets Log (Toolbar Options)
      • Activity Sheets Log (Columns)
      • Activity Sheets Log (System Activity Sheet Gear Menu)
      • Activity Sheets Log (System Activity Sheet Properties Tabs)
        • Mapped Projects Tab (System Activity Sheet)
          • Assign Rate Sheet
          • Recost
        • Schedule Tab (System Activity Sheet)
        • History Tab (System Activity Sheet) and (Manual Activity Sheet)
      • Creating System Activity Sheet
        • System Activity Sheet Log (Activity Sheet)
      • System Activity Sheet Log Toolbar options
        • Current Project View
        • Baseline Project View
      • System Activity Sheet Log Columns
      • System Activity Sheet Log Gear Menu Options
      • System Activity Sheet Log Properties Tabs
        • General Tab
        • Assignment Tab
        • Activity Spread Tab
        • Audit Log Tab
      • Activity Sheet User Defined Report (UDR)
      • Roll Up Activity Sheet to Cost Sheet
      • Supported Objects for P6 XML Import (System Activity Sheet)
      • Rate Sheet Node
        • Rate Sheets Node Log Window
          • Rate Sheets Log Window Tabs
        • Creating a Rate Sheet
        • Rate Sheet Window
          • Rates
      • WBS Sheet Node
        • System WBS Sheet Log Toolbar options
        • System WBS Sheet Log Columns
        • System WBS Sheet Log WBS Gear Menu
        • System WBS Sheet Log Properties Tabs
        • Creating a WBS Sheet
          • Manual WBS Sheet
        • Adding Columns to a WBS Sheet
        • Auto-Creating Variance Analysis BP Records
        • Viewing a WBS Sheet
      • OBS Sheet Node
        • OBS Sheet Node Log Window
        • Accessing an OBS Sheet
        • Creating an OBS Sheet
    • About Unifier and P6 Integration
    • About Unifier and Oracle Primavera Cloud Integration
    • Source Application Link in Activity Sheet
    • Activity Sheet Created from P6 through Gateway
    • Activity Sheet Created from Oracle Primavera Cloud Project through Gateway
    • Unifier Activity Manager for Oracle Primavera Cloud Schedules
    • Using Activity Sheet Data to Track Baseline, Forecast, and Spends in Cash Flow
    • Activity Sheet with Resource-Loaded and Cost-Loaded Schedules
    • P6 Activity Picker in Business Process or Shell Details
      • Activity Picker
      • WBS Picker in a Business Process
    • Earned Value Manager
      • Earned Value Analysis
        • Earned Value Analysis Log Window
          • Preview Tab
          • General Tab
          • Properties Tab
          • Schedule Tab
          • History Tab
        • Creating an Earned Value Analysis Sheet
        • Earned Value Analysis Sheet
          • Cumulative Tab
          • Incremental Tab
          • At Completion Tab
          • Variance Tab
          • Indices Tab
        • Performance Percentage Completion Sheet
        • Performance Percentage Completion Sheet - Toolbar
        • Roll Up Earned Value Analysis to Cost Sheet
        • Earned Value Analysis User Defined Report (UDR)
      • Earned Value Analysis Report
        • Earned Value Analysis Reports Log Window
        • Creating an Earned Value Analysis Report
        • Record-Level Permissions
      • Earned Value Management Permissions
    • Earned Value Management Attributes
      • Recost – Activity Attributes
      • Recost – Assignment Attributes
      • WBS Attributes
      • Activity Attributes (General)
      • Activity Attributes (Scheduling)
      • Activity Attributes (Units)
      • Activity Attributes (Cost)
      • Activity Attributes – Earned Value
      • Resource Attributes
      • Role Attributes
      • Rate Sheet – Rate Tab
    • Earned Value Management Templates
      • OBS Templates
      • WBS Templates
    • Earned Value Management Configuration Package
      • OBS Configuration Package
      • WBS Configuration Package
  • Copyright