Activity Manager

The system lets you create, consolidate, and monitor activities that must be completed on a schedule by way of the Activity Manager.

The ORACLE PROJECT TEMPLATE includes templates for a Master Schedule (also known as a Milestone Schedule) activity sheet and a Project Schedule activity sheet. (The ORACLE PROJECT TEMPLATE also includes a sample WBS Sheet.) By default, the Project Cash Flow Baseline and Forecast curves in the Project Schedule template pull the Start Date and Finish Date from the Master Schedule.

A Project Manager or Coordinator can use these templates in new Projects. After editing the WBS Sheet, defining tasks, and setting durations, schedule the Activity Sheet and set a baseline. Doing so populates the start and end dates for the default cash flow curves.

If you do not use a Master Schedule activity sheet, you can set cash flow dates manually or use an integrated schedule from Oracle Primavera Cloud or P6.

The Activity Manager node, or module, contains the following sub-nodes, when available:

To access the Activity Manager node:

  1. Go to the shell tab and switch to User mode.
  2. In the left Navigator, select Activity Manager to expand it.

The following table provides summary details about each sub-node.

Note: To view the Activity Sheet, or other sheets, you must have the appropriate permissions.

You can create user-defined reports (UDRs) from the Activity Sheet Data Elements (DEs).

The Activity Manager node contains the following sub-nodes:

Sub-node name

Description

Activity Sheet

The Activity Sheet sub-node contains a list of activity sheets listed in the Activity Sheets log. You can have multiple activity sheets.

WBS Sheet

A WBS Sheet (Work Breakdown Structure sheet) contains the following information:

  • Planned Units
  • Planned Total Cost
  • Actual Units
  • Actual Total Cost
  • Remaining Units
  • Remaining Total Cost
  • At Completion Units
  • At Completion Total Cost

The WBS Sheet node log displays the only available WBS sheet.

In This Section

Activity Sheet Sub-Node

Creating a Manual Activity Sheet

Importing Manual Activity Sheet

Creating a WBS Sheet

Manual Activity Sheet

Bulk Assigning WBS Code to Different Activities

Link Activities (Adding Dependencies)

Manual Activity Sheet Gear Menu

Manual Activity Sheet Start Date, Finish Date, and Duration

Manual Activity Sheet and CSV Template

Manual Activity Sheet Categories

Manual Activity Sheet (Schedule Types)

Manual Activity Sheet Dates

Activity Sheet User Defined Report (UDR)

Creating and Managing Views in Activity Sheets and the System Activity Sheet