6 Post-Feature Activation Overview

The procedures shown in the following table are executed inside a maintenance window. Procedure completion times shown here are estimates. Times may vary due to differences in database size, network configuration and loading, user experience, and user preparation.

Table 6-1 Post-Feature Activation Overview

Procedure Elapsed Time (Hours:Minutes) Activity Feature Activation Preparation Impact
  This Step Cum.    
Perform Health Check Post-Feature Activation 0:01-0:05 0:01-0:05
  • Verify Server status.
  • Log all current alarms.
DCA has been activated on DSR.