2.2 Preactivation Overview
The preactivation procedures shown in the following table can be performed outside a maintenance window if required. Procedure completion times shown here are estimates. Times may vary due to differences in database size, network configuration and loading, user experience, and user preparation.
Table 2-1 Preactivation Overview
Procedure | Elapsed Time (Hours:Minutes) | Feature Activation Prerequisites | |
---|---|---|---|
This Step | Cumulative | ||
System Topology Check | 0:00-1:00 | 0:00-1:00 |
|
Perform Health Check | 0:01-0:20 | 1:01-1:20 |
|