2.2.3 Post-Feature Activation Review
The procedures shown in the following table are executed inside a maintenance window. Procedure completion times shown here are estimates. Times may vary due to differences in database size, network configuration and loading, user experience, and user preparation.
Table 2-3 Post-Feature Activation Overview
Procedure | Elapsed Time (Hours:Minutes) | Activity Feature Activation Completion | Impact | |
---|---|---|---|---|
This Step | Cum. | |||
Pre-Feature Activation Health Check | 0:05 | 0:05 |
|
RBAR is activated on DSR |