Loading the Schema on the Target Database

Perform the following procedure to run Load jobs on the target database.

To run the Load jobs on the target database

  1. On the Target Database Non-Additive Processes menu, select option 3: Load/Re-Load Schema, and press Enter.

  2. Run the job using the JCL in data set DSNHLQ.SIEBEL.INSTALL.JCL(SUBLOAD).

    This submits all the Load jobs to run in parallel. The number of upgrade Load jobs varies by upgrade path.

    Note: If your database layout allows multiple tables for each table space, Loads for the same table space are stacked in the input job queue using the same job name to guarantee serialized loading.
  3. Verify that the job ran successfully with a return code of 0 or 4. For information, see Verifying JCL Upgrade Jobs.

  4. After submitting the job, enter cancel on the command line or press PF3 to save changes.