Example 1 — Flow Stops

In the example below, the value from stage A ($100) is allocated to B1, B2, and B3.


This graphic displays an assignment for which the flow has stopped, as explained in text after the graphic.

The values from B1 and B2 are allocated to C1 and C2 respectively; however, B3 has no further assignments. In this example, the $50 from B3 will be reported under UnassignedCost or UnassignedRevenue in the Measures dimension.