G/L Date
This processing option specifies the G/L date to use for the journal entries that the system creates for draft remittance.
- 1. Journal Entry G/L Date
Specify the G/L date to assign to the journal entry that the system generates for remitted drafts. If you leave this processing option blank, the system assigns the system date.