Calculated Actual Variance

This report provides the actual variances that exist between planned costs and actual costs for each branch or item/branch combination. The report also shows details of the work order and the breakdown of the variances based on cost type.

This report contains the following components:

  • Calculated Actual Variance Greater Than Zero - by Branch (pie chart)

  • Calculated Actual Variance Greater Than Zero - by Item/Branch (bar graph)

  • Calculated Actual Variance Less Than Zero - by Item/Branch (bar graph)

  • Calculated Actual Variance (table)

The Calculated Actual Variance table component contains drill back functionality as described in the following table:

Functionality

Value

Table column containing drill back link

Work Order Number

Table columns passed to application

Work Order Number

Application called

Production Cost Inquiry (P31022)

Form called

W31022A

Version called

ZJDE0001