Calculated Actual Variance
This report provides the actual variances that exist between planned costs and actual costs for each branch or item/branch combination. The report also shows details of the work order and the breakdown of the variances based on cost type.
This report contains the following components:
Calculated Actual Variance Greater Than Zero - by Branch (pie chart)
Calculated Actual Variance Greater Than Zero - by Item/Branch (bar graph)
Calculated Actual Variance Less Than Zero - by Item/Branch (bar graph)
Calculated Actual Variance (table)
The Calculated Actual Variance table component contains drill back functionality as described in the following table:
Functionality |
Value |
---|---|
Table column containing drill back link |
Work Order Number |
Table columns passed to application |
Work Order Number |
Application called |
Production Cost Inquiry (P31022) |
Form called |
W31022A |
Version called |
ZJDE0001 |