Resources
Select the Resources tab.
- Work Group Code
Specify the work group code for the operation. Values are set up in the Work Groups program (P31B11).
- Staff Number
Specify a staff number for the operation. The system enables you to enter either a staff number or a work group code. Values are set up in the Staff Information program (P31B02).
- Actual Time
Enter the actual time that a work group or staff member spent on an operation.
- Time UOM (time unit of measure)
Select the code for the time duration.