Forms Used to Reassign Production Numbers

Form Name

FormID

Navigation

Usage

Production Number Reassignment

W34404A

  • MRP Daily Operations (G3413), Production No. Reassignment

  • Periodic Forecasting Operations (G3421), Production No. Reassignment

    Single Site Periodic Planning Operations (G3422), Production No. Reassignment

    Multi-Facility Planning (G3423), Production No. Reassignment

  • On the Production Number Workbench form, select a record in the Production Number Master grid and select the Prod No. Reassignm option from the Row menu.

Reassign production numbers.