Prerequisites
Before you complete the tasks in this section:
-
Set up the following user-defined codes:
-
Job Type (06/G)
-
Cost Method (40/CM)
-
-
Set the Inventory Cost Level field in the Item Master program (P4101) to a value of 1 or 2 for style items.
-
Enter a value for the style item root level 0 in the Item Cost File table (F4105) in the Item Branch program (P41026).
-
Set processing options for the Create Outsource Operation Details for Style Items program (PCW93).
-
Set processing options for the Copy to Outsource Operation Details for Style Items program (RCW93).