Validating Requirements Plans

This section provides an overview of the validation process, lists prerequisites, and discusses how to:

  • Review work center loads.

  • Review period summaries.

  • Set processing options for Operation Dispatch Inquiry (P31220).

  • Review work schedules for production status.

  • Set processing options for Work Center Schedule Review (P31224).

  • Review rate schedule and work center loads.

  • Review the Shop Floor Workbench for MRP.