ENS1005 - Compare BOMs Report
Use the Compare BOM Report to compare any two engineering BOMs or a manufacturing BOM and an engineering BOM within the same business unit. Using this report, you can compare one or more baseline BOMs to one target BOM. In the Baseline BOM (BOM1) group box, specify the item ID BOM that serves as the basis for comparison. The baseline BOM may have an engineering or manufacturing BOM state. The item ID that you specify in the Target BOM (BOM2) group box is the BOM that you are comparing with the baseline BOM (BOM1). The target BOM has an engineering BOM state.
| Field or Control | Description |
|---|---|
|
Differences |
This field behaves the same way for all pages in this group. It displays the differences between the two BOMs. Values are:
|
The report includes component and assembly differences between the two BOMs so that you can use it to track changes.
Baseline BOM (BOM1):
Select the BOM state. Values are: Engineering or Manufacturing.
Select an item ID and a valid BOM code from the available options.
To use the BOM with a code of 1, select 1 in both fields. You can also compare all the existing BOMs for the item to the target routing by selecting the appropriate BOM codes.
Select the All Dates/Revs check box to compare all effective dates and revisions for the baseline BOMs. To compare a BOM with a specific effective date, deselect the All Dates/Revs check box, and enter the specific effective date.
Target BOM (BOM2):
Engineering appears by default as the BOM state; it is display-only.
Select an item ID and a valid BOM code for the target BOM.
Select the All Dates/Revs check box to compare all effective dates and revisions for the BOM. To compare a BOM with a specific effective date, enter the specific effective date.
| Field or Control | Description |
|---|---|
|
Print Options |
These options denote detailed information that you may want to appear on the hard copy report. You can select all attributes of the BOM or selected attributes. Attributes include:
|