ENS1010 - BOM Cost Report
| Field or Control | Description |
|---|---|
|
Cost as Batch |
Select this check box if the BOM has multiple outputs. |
|
Print Lower Level Outputs |
Select this check box if you want the hard copy report to include the costs of multiple output items for components that are end items. |