Common Elements Used in Operation Lists
| Field or Control | Description |
|---|---|
|
Production Area |
Area where the item is being manufactured. |
|
Item and Description |
Name and description of the item being manufactured. |
|
Config Code (configuration code) |
Unique identifier for costing and inventory tracking purposes. The configuration code appears if the end item is a configured item. |
|
Production Status |
Current status of the production. |
|
Prdn ID (production ID) |
Production order identifier. |
|
Sch Method (scheduling method) |
Scheduling method used to manufacture the item. Values are Forward and Backward. |
|
Prdn Type (production type) |
Type of production being manufactured. Values are Production, Rework, and Teardown. |
|
Prdn Start Qty (production start quantity) |
The quantity required at the beginning of the production process. This quantity will be inflated to account for any operation yield if the system calculates the beginning production quantity. |
|
Prdn End Qty (production end quantity) |
The quantity expected at the end of the production process. This quantity will be rounded down to account for any operation yield if the system calculates the ending production quantity. |
|
Source Cd (source code) |
Code indicates if the production is Make or Buy. |
|
Routing Code |
Routing code associated with the selected production. |
|
Rtg Item (routing item) |
Item on which the referenced item's routing is based. |
|
Frozen |
Indicates if the production is frozen by PeopleSoft Supply Planning. |
|
Op Seq (operation sequence) |
Operation step where the process occurs. |
|
Work Center |
Work center location where the operation step and tasks are performed. |
|
Operation Start Date |
Date the operation step is or was due to begin. |
|
Start Time |
Time the operation step is or was due to begin. |
|
Operation Due Date |
Date the operation step is or was due to be completed. |
|
Due Time |
Time the operation step is or was due to be completed. |
|
Calculate Yield and Reschedule |
If you change the work center, task, operation sequence, or one or more operation type or time, click this link to update the schedule. |