Asset Assignment To Multiple Projects
You can associate the same asset with multiple projects if any of these conditions exist:
-
The projects are work order-managed.
-
Asset integration is disabled on all but one of the projects.
-
The projects belong to the same program, and the asset is not associated with projects that are asset integration enabled on a different program.
Use the assign assets to multiple projects functionality when:
-
A summary project or program contains child projects that contribute transaction costs to the same asset.
-
A project is complete and the related asset is capitalized, and later additional costs are accumulated for the same asset in a new project.
You must disable integration on the project where the asset integration was previously completed.
-
Multiple work order-managed projects are set up to accumulate costs for the same asset over time or simultaneously.