Unlock an Integration Schedule
When a schedule is in edit mode and the browser fails, the schedule becomes locked, which prevents it from being edited. You can unlock an integration schedule to resume editing.
-
Log in as a user with the Administrator role.
-
In the navigation pane, click Design, then Integrations.
-
Click Actions
, then select Schedule.
The Schedule and future runs page is displayed.
- Click Actions
, then select Unlock schedule.
- Click Unlock when prompted. Note that unlocking an integration schedule may cause data loss.