Delete an Integration Schedule

You can delete a schedule for an integration. This action deletes all future runs of the schedule and stops any currently running schedule integrations.

  1. In the navigation pane, click Design, then Integrations.
  2. Hover over the row of the integration on which the scheduler run is defined.
  3. Click Actions Actions icon,then select Schedule.
    The Schedule and future runs page is displayed.
  4. Click Schedule menu Schedule menu icon, then select Delete schedule.
  5. Click Confirm when prompted. This deletes the schedule. Any scheduled jobs currently running are stopped.