Edit an Integration Schedule

You can edit a schedule for an integration run.

  1. In the navigation pane, click Design, then Integrations.
  2. Hover over the row of the integration on which the scheduled run is defined.
  3. Click Actions Actions icon, then select Schedule.
    The Schedule and future runs page is displayed.
  4. Click Edit Edit icon.
  5. Edit the schedule. See Define the Integration Schedule.
  6. Click Save.