5 Create Scheduled Integrations
You can schedule the running of integrations. For example, you can create an orchestrated integration that is triggered by a schedule or create a basic routing integration in which a trigger FTP Adapter reads a file and an invoke FTP Adapter writes the file. You can schedule this integration run to copy files at a date and time of your choosing. You can also define the frequency of the integration. When you create either of these types of integrations, a schedule icon is displayed with the integration entry on the Integrations page.
Topics:
- Change the User Submitting an Integration Schedule
- Globally Change the Submitter of Integration Schedules
- Unlock an Integration Schedule
- Convert a Scheduled Integration to a REST Adapter-Triggered Orchestration Integration
- Understand the Behavior of Scheduled Integrations When Using the Local Time Zone
-
Activate Older, Imported Scheduled Integrations Using Operations Other Than Read Multiple Files
See Understand the FTP Adapter in Using the FTP Adapter with Oracle Integration Generation 2.