Projects

This section provides details about Oracle Fusion ERP Analytics Projects subject area metrics.

PPM - Grants Award Funding (Preview)

These metrics are used in the Award Currency fact folder in the subject area. Award Currency and Project Currency are the same.

Metric Metric Definition
Direct Funding Amount Shows the funding amount for direct costs granted by Sponsor.
Indirect Funding Amount Shows the funding amount for indirect costs granted by Sponsor.
Total Funding Amount Total funding amount is sum of direct and indirect funding amount.
Unallocated Funding Amount Unallocated funding amount is the amount not allocated to any project within the award.
Organization Credit Amount Organization Credit amount is the portion of funding amount that Organization receives based on the credit percentage assigned to the organization. Total Funding Amount is used for Award level assignment and Project Funding Amount for Project Level Assignment.
Personnel Credit Amount Personnel Credit amount is the portion of funding amount a person receives based on the credit percentage assigned to the person. Total Funding Amount is used for Award level assignment and Project Funding Amount for Project Level Assignment.
Project Funding Amount Project Funding amount is the amount allocated to the project within the award.
Project Budget Amount Current Approved Budget Burdened Cost in Project Currency from Project Budget Fact. This metric will be available only if Project Costing, Commitments and Project Controls functional areas are activated.
Project Commitment Amount Commitment Amount in Project Currency from Project Commitment fact. This metric will be available only if Project Costing, Commitments and Project Controls functional areas are activated.
Project Actual Amount Burdened Cost in Project Currency from Project Costs fact. This metric will be available only if Project Costing, Commitments and Project Controls functional areas are activated.
Project Unbudgeted Amount Project Unbudgeted Amount is calculated as Project Funding Amount - Project Budget Amount. This metric will be available only if Project Costing, Commitments and Project Controls functional areas are activated.
Consumed Amount Consumed amount will be calculated only for the current budget period. For Restricted Authority, consumed amount is the sum of project actual amount and project commitment amount for the current budget period. For Expanded Authority, consumed amount is the sum of project actual amount and project commitment amount since inception till the current budget period. This metric will be available only if Project Costing, Commitments, and Project Controls functional areas are activated.
Remaining Amount Remaining Amount is calculated as (Consumed Amount / Elapsed Days) * Remaining Days. This will be displayed only for the current budget period both for the enhanced authority and restricted authority awards. This metric will be available only if Project Costing, Commitments, and Project Controls functional areas are activated.
Elapsed Days Elapsed Days is calculated as Current Date - Start Date, where Start date is the award start date in awards that are enabled for expanded authority awards. For restricted authority awards, the start date is the current budget period start date. This metric is calculated only for the current budget period.
Remaining Days Remaining Days is calculated as Current Budget Period End date - Current Date. This metric is calculated only for the current budget period for both enhanced and restricted authority awards.
Burn Rate Burn Rate is calculated as (Consumed Amount + Remaining Amount) / Budget Amount in Percentage. This metric is calculated only for the current budget period. For Enhanced authority the budget amount is the ITD budget amount till the current budget period. For Restricted authority the budget amount is the current period budget amount. This metric will be available only if Project Costing, Commitments, and Project Controls functional areas are activated.

PPM - Project Assets (Preview)

These metrics are used in the Ledger Currency (LC) fact folder in the subject area.

Metric Metric Definition
Actual Asset Units Shows the Actual Asset Units assigned to the Asset.
Assigned CIP Cost Shows the Assigned CIP Cost that is the cost grouped to create Assets lines and assigned to Asset but not transferred to Fixed Assets.
Burden Cost Shows the Actual Burden Cost calculated as difference between Burdened Cost and Raw Cost.
Burdened Cost Shows the Actual Burdened Cost incurred.
Capitalizable Cost Shows the Raw cost or Burdened Cost from Cost distribution lines flagged as Capitalizable based on whether Raw or Burdened Cost is Capitalizable for the project type.
Capitalized Cost Shows the Capitalized Cost that is the cost transferred to Fixed Assets module.
Current Amount Shows the Current Amount from Asset Lines.
Estimated Asset Cost Shows the Estimated Asset Cost.
Estimated Asset Units Shows the Estimated Asset Units.
Grouped CIP Cost Shows the Grouped CIP Cost that is the cost grouped to create Asset lines but not transferred to Fixed Assets.
Grouped Cost Shows the Grouped Cost that is the cost grouped to create Asset lines.
Non-Capitalizable Cost Shows the Actual Burdened Cost from Cost Distribution lines flagged as not Capitalizable for Capitalizable projects.
Original Amount Shows the Original Amount from Asset Lines.
Quantity Number of units related to an expenditure item.
Raw Cost Shows the Actual Raw Cost incurred.
Rejected CIP Cost Shows the Rejected CIP Cost that is the cost grouped to create Assets lines but rejected during transfer to Fixed Assets.
Total Asset Cost Shows the Total Asset Cost.
Unassigned CIP Cost Shows the Unassigned CIP Cost that is the cost grouped to create Assets lines but not assigned to Asset and not transferred to Fixed Assets.

PPM - Project Budgets

These metrics are used in the Analytics Currency (AC), Document Currency (DC), Project Currency (PC), and Project Ledger Currency (PLC) fact folders in subject areas. Analytics currency and exchange rate type are configured during product implementation. Exchange rate date basis uses project ledger currency conversion rate date to convert to analytics currency. Metrics in these folders show amounts in their respective currencies.

Metric Metric Definition
BAC Burdened Cost Budget at completion burdened cost of any baselined budget version.
BAC Equipment Effort Budget at completion equipment effort of any baselined budget version.
BAC Labor Effort Budget at completion labor effort for any baselined budget version.
BAC Margin Budget at completion margin of any baselined budget version.
BAC Margin Percentage Budget at completion margin percentage of any baselined budget version.
BAC Quantity Budget at completion quantity of any baselined budget.
BAC Raw Cost Budget at completion raw cost of any baselined budget version.
BAC Revenue Budget at completion revenue of any baselined budget version.
Budget Burdened Cost Burdened cost of any baselined budget version.
Budget Burdened Cost - ITD Inception-to-date burdened cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Burdened Cost - PTD Period-to-date burdened cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Burdened Cost - QTD Quarter-to-date burdened cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Burdened Cost - YTD Year-to-date burdened cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Equipment Effort Equipment effort for any baselined budget version.
Budget Labor Effort Labor effort for any baselined budget version.
Budget Margin Budget margin of any baselined budget version.
Budget Margin - ITD Inception-to-date budget margin of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Margin - PTD Period-to-date budget margin of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Margin - QTD Quarter-to-date budget margin of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Margin - YTD Year-to-date budget margin of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Margin Percentage Margin percentage of any baselined budget version.
Budget Margin Percentage - ITD Inception-to-date margin percentage of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Margin Percentage - PTD Period-to-date margin percentage of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Margin Percentage - QTD Quarter-to-date margin percentage of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Margin Percentage - YTD Year-to-date margin percentage of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Quantity Budget quantity of any baselined budget version.
Budget Quantity - ITD Inception-to-date budget quantity of any baselined budget version calculated using the receiver fiscal calendar.
Budget Quantity - PTD Period-to-date budget quantity of any baselined budget version.
Budget Quantity - QTD Quarter-to-date budget quantity of any baselined budget version calculated using the receiver fiscal calendar.
Budget Quantity - YTD Year-to-date budget quantity of any baselined budget version calculated using the receiver fiscal calendar.
Budget Raw Cost Raw cost of any baselined budget version.
Budget Raw Cost - ITD Inception-to-date raw cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Raw Cost - PTD Period-to-date raw cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Raw Cost - QTD Quarter-to-date raw cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Raw Cost - YTD Year-to-date raw cost of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Revenue Budget revenue of any baselined budget version.
Budget Revenue - ITD Inception-to-date budget revenue of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Revenue - PTD Period-to-date budget revenue of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Revenue - QTD Quarter-to-date budget revenue of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Budget Revenue - YTD Year-to-date budget revenue of any baselined budget version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current BAC Burdened Cost Budget at completion burdened cost of baselined budget version flagged as current.
Current BAC Equipment Effort Budget at completion equipment effort of approved baselined budget version flagged as current.
Current BAC Labor Effort Budget at completion labor effort for approved baselined budget version flagged as current.
Current BAC Margin Budget at completion margin of baselined budget version flagged as current.
Current BAC Margin Percentage Budget at completion margin percentage of baselined budget version flagged as current.
Current BAC Quantity Budget at completion quantity of approved baselined budget version flagged as current.
Current BAC Raw Cost Budget at completion raw cost of baselined budget version flagged as current.
Current BAC Revenue Budget at completion revenue of baselined budget version flagged as current.
Current Budget Burdened Cost Burdened cost of baselined budget version flagged as current.
Current Budget Burdened Cost - ITD Inception-to-date burdened cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Burdened Cost - PTD Period-to-date burdened cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Burdened Cost - QTD Quarter-to-date burdened cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Burdened Cost - YTD Year-to-date burdened cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Equipment Effort Equipment effort for approved baselined budget version flagged as current.
Current Budget Labor Effort Labor effort for approved baselined budget version flagged as current.
Current Budget Margin Budget margin of baselined budget version flagged as current.
Current Budget Margin - ITD Inception-to-date budget margin of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Margin - PTD Period-to-date budget margin of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Margin - QTD Quarter-to-date budget margin of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Margin - YTD Year-to-date budget margin of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Margin Percentage Margin percentage of baselined budget version flagged as current.
Current Budget Margin Percentage - ITD Inception-to-date margin percentage of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Margin Percentage - PTD Period-to-date margin percentage of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Margin Percentage - QTD Quarter-to-date margin percentage of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Margin Percentage - YTD Year-to-date margin percentage of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Quantity Budget quantity of approved baselined budget version flagged as current.
Current Budget Quantity - ITD Inception-to-date budget quantity of approved baselined budget version flagged as current calculated using the receiver fiscal calendar.
Current Budget Quantity - PTD Period-to-date budget quantity of approved baselined budget version flagged as current calculated using the receiver fiscal calendar.
Current Budget Quantity - QTD Quarter-to-date budget quantity of approved baselined budget version flagged as current calculated using the receiver fiscal calendar.
Current Budget Quantity - YTD Year-to-date budget quantity of approved baselined budget version flagged as current calculated using the receiver fiscal calendar.
Current Budget Raw Cost Raw cost of baselined budget version flagged as current.
Current Budget Raw Cost - ITD Inception-to-date raw cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Raw Cost - PTD Period-to-date raw cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Raw Cost - QTD Quarter-to-date raw cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Raw Cost - YTD Year-to-date raw cost of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Revenue Budget revenue of baselined budget version flagged as current.
Current Budget Revenue - ITD Inception-to-date budget revenue of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Revenue - PTD Period-to-date budget revenue of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Revenue - QTD Quarter-to-date budget revenue of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Budget Revenue - YTD Year-to-date budget revenue of baselined budget version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Versus Original BAC Burdened Cost Variance Variance between current and original approved budget at completion burdened cost amount.
Current Versus Original BAC Margin Percentage Variance Variance between current and original approved budget at completion margin percentage.
Current Versus Original BAC Margin Variance Variance between current and original approved budget at completion margin.
Current Versus Original BAC Raw Cost Variance Variance between current and original approved budget at completion raw cost amount.
Current Versus Original BAC Revenue Variance Variance between current and original approved budget at completion revenue amount.
Original BAC Burdened Cost Budget at completion burdened cost of baselined budget version flagged as original.
Original BAC Equipment Effort Budget at completion equipment effort of approved baselined budget version flagged as original.
Original BAC Labor Effort Budget at completion labor effort for approved baselined budget version flagged as original.
Original BAC Margin Budget at completion margin of baselined budget version flagged as original.
Original BAC Margin Percentage Budget at completion margin percentage of baselined budget version flagged as original.
Original BAC Quantity Budget at completion quantity of approved baselined budget version flagged as original.
Original BAC Raw Cost Budget at completion raw cost of baselined budget version flagged as original.
Original BAC Revenue Budget at completion revenue of baselined budget version flagged as original.
Original Budget Burdened Cost Burdened cost of baselined budget version flagged as original.
Original Budget Burdened Cost - ITD Inception-to-date burdened cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Burdened Cost - PTD Period-to-date budget revenue of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Burdened Cost - QTD Quarter-to-date budget revenue of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Burdened Cost - YTD Year-to-date budget revenue of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Equipment Effort Equipment effort for approved baselined budget version flagged as original.
Original Budget Labor Effort Labor effort for approved baselined budget version flagged as original.
Original Budget Margin Budget margin of baselined budget version flagged as original.
Original Budget Margin - ITD Inception-to-date budget margin of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Margin - PTD Period-to-date budget margin of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Margin - QTD Quarter-to-date budget margin of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Margin - YTD Year-to-date budget margin of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Margin Percentage Margin percentage of baselined budget version flagged as original.
Original Budget Margin Percentage - ITD Inception-to-date margin percentage of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Margin Percentage - PTD Period-to-date margin percentage of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Margin Percentage - QTD Quarter-to-date margin percentage of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Margin Percentage - YTD Year-to-date margin percentage of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Quantity Budget quantity of approved baselined budget version flagged as original.
Original Budget Quantity - ITD Inception-to-date budget quantity of approved baselined budget version flagged as original calculated using the receiver fiscal calendar.
Original Budget Quantity - PTD Period-to-date budget quantity of approved baselined budget version flagged as original calculated using the receiver fiscal calendar.
Original Budget Quantity - QTD Quarter-to-date budget quantity of approved baselined budget version flagged as original calculated using the receiver fiscal calendar.
Original Budget Quantity - YTD Year-to-date budget quantity of approved baselined budget version flagged as original calculated using the receiver fiscal calendar.
Original Budget Raw Cost Raw cost of baselined budget version flagged as original.
Original Budget Raw Cost - ITD Inception-to-date raw cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Raw Cost - PTD Period-to-date burdened cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Raw Cost - QTD Quarter-to-date burdened cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Raw Cost - YTD Year-to-date burdened cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Revenue Budget revenue of baselined budget version flagged as original.
Original Budget Revenue - ITD Inception-to-date budget revenue of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Revenue - PTD Period-to-date raw cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Revenue - QTD Quarter-to-date raw cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Budget Revenue - YTD Year-to-date raw cost of baselined budget version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.

PPM - Project Commitments

These metrics are used in the Analytics Currency (AC), Document Currency (DC), Project Currency (PC), Project Ledger Currency (PLC), and Ledger Currency (LC) fact folders in Subject areas. Analytics currency and exchange rate type are configured during product implementation. Exchange rate date basis uses ledger currency conversion rate date if this date is populated, and if not available uses expenditure item date to convert to analytics currency. Metrics in these folders show amounts in their respective currencies.

Metric Metric Definition
Canceled Amount Shows the Canceled amount from the commitment transaction. This metric is available only in Document Currency.
Canceled Quantity Total number of units canceled in the commitment transaction.
Committed Burden Cost Shows the burden cost of the commitment transaction.
Committed Burdened Cost Shows the burdened cost of the commitment transaction.
Committed Cost Shows the burdened cost of the commitment transaction.
Committed Raw Cost Shows the raw cost of the commitment transaction.
Delivered Amount Shows the Delivered amount from the commitment transaction. This metric is available only in Document Currency.
Delivered Quantity Total number of units delivered in the commitment transaction.
External Committed Burden Cost Shows the burden cost of external commitment transactions.
External Committed Burdened Cost Shows the burdened cost of external commitment transactions.
External Committed Raw Cost Shows the raw cost of external commitment transactions.
Invoiced Amount Shows the invoiced amount from the commitment transaction. This metric is available only in Document Currency.
Invoiced Quantity Total number of units invoiced in the commitment transaction.
Ordered Amount Shows the ordered amount from the commitment transaction. This metric is available only in Document Currency.
Ordered Quantity Total number of units ordered in the commitment transaction.
Original Ordered Amount Shows the original ordered amount from the commitment transaction. This metric is available only in Document Currency.
Original Ordered Quantity Total number of units originally ordered in the commitment transaction.
Outstanding Delivery Amount Shows the outstanding Delivery amount from the commitment transaction. This metric is available only in Document Currency.
Outstanding Delivery Quantity Total number of units to be delivered in the commitment transaction.
Outstanding Invoice Amount Shows the outstanding invoice amount from the commitment transaction. This metric is available only in Document Currency.
Outstanding Invoice Quantity Total number of units yet to be invoiced in the commitment transaction.
Overbilled Amount Shows the overbilled amount from the commitment transaction. This metric is available only in Document Currency.
Overbilled Quantity Total number of units overbilled in the commitment transaction.
Purchase Order Committed Burden Cost Shows the purchase order burden cost.
Purchase Order Committed Burdened Cost Shows the purchase order burdened cost.
Purchase Order Committed Raw Cost Shows the purchase order raw cost.
Quantity Total number of units committed.
Requisition Committed Burden Cost Shows the purchase requisition burden cost.
Requisition Committed Burdened Cost Shows the purchase requisition burdened cost.
Requisition Committed Raw Cost Shows the purchase requisition raw cost.
Supplier Invoice Committed Burden Cost Shows the supplier invoice burden cost.
Supplier Invoice Committed Burdened Cost Shows the supplier invoice burdened cost.
Supplier Invoice Committed Raw Cost Shows the supplier invoice raw cost.
Transfer Order Committed Burden Cost Shows the transfer order burden cost.
Transfer Order Committed Burdened Cost Shows the transfer order burdened cost.
Transfer Order Committed Raw Cost Shows the transfer order raw cost.

PPM - Project Costs

These metrics are used in the Analytics Currency (AC), Document Currency (DC), Project Currency (PC), Project Ledger Currency (PLC), and Ledger Currency (LC) fact folders in subject areas. Analytics currency and exchange rate type are configured during product implementation. Exchange rate date basis uses ledger currency conversion rate date if this date is populated, and if not available uses expenditure item date to convert to analytics currency. Metrics in these folders show amounts in their respective currencies.

Metric Metric Definition
Accounted Burden Cost Shows the burden cost amount that is accounted. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Accounted Burdened Cost Shows the burdened cost amount that is accounted. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Accounted Raw Cost Shows the raw cost amount that is accounted. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Billable and Capitalizable Burden Cost Shows the billable and capitalizable burden cost calculated as difference between billable and capitalizable burdened cost.
Billable and Capitalizable Burden Cost - ITD Cumulative sum of billable and capitalizable burden cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Burden Cost - PTD Period-to-date billable and capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Burden Cost - QTD Quarter-to-date billable and capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Burden Cost - YTD Year-to-date billable and capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Cost Shows the raw cost or burdened cost from cost distribution lines flagged as capitalizable and billable based on whether raw or burdened cost is capitalizable for the project type.
Billable and Capitalizable Cost - ITD Cumulative sum of billable and capitalizable burdened cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Cost - PTD Period-to-date billable and capitalizable burdened cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Cost - QTD Quarter-to-date billable and capitalizable burdened cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Cost - YTD Year-to-date billable and capitalizable burdened cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Raw Cost Shows the actual raw cost from cost distribution lines flagged as both billable and capitalizable.
Billable and Capitalizable Raw Cost - ITD Cumulative sum of billable and capitalizable raw cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Raw Cost - PTD Period-to-date billable and capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Raw Cost - QTD Quarter-to-date billable and capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable and Capitalizable Raw Cost - YTD Year-to-date billable and capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Burden Cost Shows the billable burden cost calculated as difference between billable cost and billable raw cost.
Billable Burden Cost - ITD Cumulative sum of billable burden cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Burden Cost - PTD Period-to-date billable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Burden Cost - QTD Quarter-to-date billable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Burden Cost - YTD Year-to-date billable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency. only.
Billable Cost Shows the actual burdened cost from cost distribution lines flagged as billable.
Billable Cost - ITD Cumulative sum of billable burdened cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Cost - PTD Period-to-date billable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Cost - QTD Quarter-to-date billable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Cost - YTD Year-to-date billable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Raw Cost Shows the actual raw cost from cost distribution lines flagged as billable.
Billable Raw Cost - ITD Cumulative sum of billable raw cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Raw Cost - PTD Period-to-date billable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Raw Cost - QTD Quarter-to-date billable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Billable Raw Cost - YTD Year-to-date billable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burden Cost Shows the actual burden cost calculated as difference between burdened cost and raw cost.
Burden Cost - ITD Cumulative sum of burden cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burden Cost - PTD Period-to-date burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burden Cost - QTD Quarter-to-date burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burden Cost - YTD Year-to-date burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burdened Cost Shows the actual burdened cost incurred.
Burdened Cost - ITD Cumulative sum of burdened cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burdened Cost - PTD Period-to-date burdened cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burdened Cost - QTD Quarter-to-date burdened cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Burdened Cost - YTD Year-to-date burdened cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Burden Cost Shows the capitalizable burden cost calculated as difference between capitalizable cost and capitalizable raw cost.
Capitalizable Burden Cost - ITD Cumulative sum of capitalizable burden cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Burden Cost - PTD Period-to-date capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Burden Cost - QTD Quarter-to-date capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Burden Cost - YTD Year-to-date capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Cost Shows the raw cost or burdened cost from cost distribution lines flagged as capitalizable based on whether raw or burdened cost is capitalizable for the project type.
Capitalizable Cost - ITD Cumulative sum of capitalizable burdened cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Cost - PTD Period-to-date capitalizable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Cost - QTD Quarter-to-date capitalizable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Cost - YTD Year-to-date capitalizable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Raw Cost Shows the actual raw cost from cost distribution lines flagged as capitalizable for capitalizable projects.
Capitalizable Raw Cost - ITD Cumulative sum of capitalizable raw cost from start of the project to the reporting time period selected.
Capitalizable Raw Cost - PTD Period-to-date capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Raw Cost - QTD Quarter-to-date capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Capitalizable Raw Cost - YTD Year-to-date capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Credit Amount Shows the credit amount from accounting for the cost distribution line. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Debit Amount Shows the debit amount from accounting for the cost distribution line. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Equipment Cost Shows the equipment cost calculated as burdened cost that is associated with resource class EQUIPMENT.
Equipment Cost - ITD Cumulative sum of equipment cost is calculated as burdened cost that is associated with resource class EQUIPMENT from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Equipment Cost - PTD Period-to-date equipment cost is calculated as burdened cost that is associated with resource class EQUIPMENT calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Equipment Cost - QTD Quarter-to-date equipment cost is calculated as burdened cost that is associated with resource class EQUIPMENT calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Equipment Cost - YTD Year-to-date equipment cost is calculated as burdened cost that is associated with resource class EQUIPMENT calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Equipment Effort Number of units of equipment used.
Equipment Effort - ITD Cumulative sum of units of equipment used from start of the project to the reporting time period selected calculated using the receiver fiscal calendar.
Equipment Effort - PTD Period-to-date number of units of equipment used calculated using the receiver fiscal calendar.
Equipment Effort - QTD Quarter-to-date number of units of equipment used calculated using the receiver fiscal calendar.
Equipment Effort - YTD Year-to-date number of units of equipment used calculated using the receiver fiscal calendar.
Labor Cost Shows the labor cost calculated as burdened cost that is associated with resource class PEOPLE.
Labor Cost - ITD Cumulative sum of labor cost is calculated as burdened cost that is associated with resource class PEOPLE from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Labor Cost - PTD Period-to-date labor cost is calculated as burdened cost that is associated with resource class PEOPLE calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Labor Cost - QTD Quarter-to-date labor cost is calculated as burdened cost that is associated with resource class PEOPLE calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Labor Cost - YTD Year-to-date labor cost is calculated as burdened cost that is associated with resource class PEOPLE calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Labor Effort Number of labor units related to an expenditure item.
Labor Effort - ITD Cumulative sum of labor units from start of the project to the reporting time period selected calculated using the receiver fiscal calendar.
Labor Effort - PTD Period-to-date number of labor units related to an expenditure item calculated using the receiver fiscal calendar.
Labor Effort - QTD Quarter-to-date number of labor units related to an expenditure item calculated using the receiver fiscal calendar.
Labor Effort - YTD Year-to-date number of labor units related to an expenditure item calculated using the receiver fiscal calendar.
Net Amount Shows the difference between debit amount and credit amount. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Non-Billable Burden Cost Shows the non-billable burden cost calculated as difference between non-billable cost and non-billable raw cost.
Non-Billable Burden Cost - ITD Cumulative sum of non-billable burden cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Burden Cost - PTD Period-to-date non-billable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Burden Cost - QTD Quarter-to-date non-billable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Burden Cost - YTD Year-to-date non-billable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Cost Shows the actual burdened cost from cost distribution lines flagged as not billable.
Non-Billable Cost - ITD Cumulative sum of non-billable burdened cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Cost - PTD Period-to-date non-billable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Cost - QTD Quarter-to-date non-billable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Cost - YTD Year-to-date non-billable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Raw Cost Shows the actual raw cost from cost distribution lines flagged as not billable.
Non-Billable Raw Cost - ITD Cumulative sum of non-billable raw cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Raw Cost - PTD Period-to-date non-billable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Raw Cost - QTD Quarter-to-date non-billable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Billable Raw Cost - YTD Year-to-date non-billable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Burden Cost Shows the non-capitalizable burden cost calculated as difference between non-capitalizable cost and non-capitalizable raw cost.
Non-Capitalizable Burden Cost - ITD Cumulative sum of non-capitalizable burden cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Burden Cost - PTD Period-to-date non-capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Burden Cost - QTD Quarter-to-date non-capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Burden Cost - YTD Year-to-date non-capitalizable burden cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Cost Shows the actual burdened cost from cost distribution lines flagged as not capitalizable for capitalizable projects.
Non-Capitalizable Cost - ITD Cumulative sum of non-capitalizable burdened cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Cost - PTD Period-to-date non-capitalizable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Cost - QTD Quarter-to-date non-capitalizable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Cost - YTD Year-to-date non-capitalizable cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Raw Cost Shows the actual raw cost from cost distribution lines flagged as not capitalizable for capitalizable projects.
Non-Capitalizable Raw Cost - ITD Cumulative sum of non-capitalizable raw cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Raw Cost - PTD Period-to-date non-capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Raw Cost - QTD Quarter-to-date non-capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Non-Capitalizable Raw Cost - YTD Year-to-date non-capitalizable raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Projects Count Distinct count of projects with cost distribution lines.
Quantity Number of units related to an expenditure item.
Raw Cost Shows the actual raw cost incurred.
Raw Cost - ITD Cumulative sum of raw cost from start of the project to the reporting time period selected calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Raw Cost - PTD Period-to-date raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Raw Cost - QTD Quarter-to-date raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Raw Cost - YTD Year-to-date raw cost calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Tasks Count Distinct count of tasks with cost distribution lines.
Transfer Price Amount Shows the amount charged by provider organization to the receiver organization including transfer price markup.
Unaccounted CDL Count Count of cost distribution lines that are not accounted.

PPM - Project Forecasts

These metrics are used in the Analytics Currency (AC), Document Currency (DC), Project Currency (PC), and Project Ledger Currency (PLC) fact folders in subject areas. Analytics currency and exchange rate type are configured during product implementation. Exchange rate date basis uses project ledger currency conversion rate date to convert to analytics currency. Metrics in these folders show amounts in their respective currencies.

Metric Metric Definition
Actual Burdened Cost Actual burdened cost of any baselined forecast version.
Actual Margin Actual margin of any baselined forecast version.
Actual Margin Percentage Actual margin percentage of any baselined forecast version.
Actual Raw Cost Actual raw cost of any baselined forecast version.
Actual Revenue Actual revenue of any baselined forecast version.
Current Actual Burdened Cost Actual burdened cost of primary baselined forecast version flagged as current.
Current Actual Margin Actual margin of primary baselined forecast version flagged as current.
Current Actual Margin Percentage Actual margin percentage of primary baselined forecast version flagged as current.
Current Actual Raw Cost Actual raw cost of primary baselined forecast version flagged as current.
Current Actual Revenue Actual revenue of primary baselined forecast version flagged as current.
Current EAC Burdened Cost Estimate at completion burdened cost of primary baselined forecast version flagged as current.
Current EAC Margin Estimate at completion margin of primary baselined forecast version flagged as current.
Current EAC Margin Percentage Estimate at completion margin percentage of primary baselined forecast version flagged as current.
Current EAC Raw Cost Estimate at completion raw cost of primary baselined forecast version flagged as current.
Current EAC Revenue Estimate at completion revenue of primary baselined forecast version flagged as current.
Current ETC Burdened Cost Estimate to complete burdened cost of primary baselined forecast version flagged as current.
Current ETC Margin Estimate to complete margin of primary baselined forecast version flagged as current.
Current ETC Margin Percentage Estimate to complete margin percentage of primary baselined forecast version flagged as current.
Current ETC Raw Cost Estimate to complete raw cost of primary baselined forecast version flagged as current.
Current ETC Revenue Estimate to complete revenue of primary baselined forecast version flagged as current.
Current Forecast Burdened Cost - ITD Inception-to-date burdened cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Burdened Cost - PTD Period-to-date burdened cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Burdened Cost - QTD Quarter-to-date burdened cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Burdened Cost - YTD Year-to-date burdened cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Equipment Effort Equipment effort for primary baselined forecast version flagged as current.
Current Forecast Labor Effort Labor effort for primary baselined forecast version flagged as current.
Current Forecast Margin - ITD Inception-to-date forecast margin of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Margin - PTD Period-to-date forecast margin of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Margin - QTD Quarter-to-date forecast margin of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Margin - YTD Year-to-date forecast margin of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Margin Percentage - ITD Inception-to-date margin percentage of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Margin Percentage - PTD Period-to-date margin percentage of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Margin Percentage - QTD Quarter-to-date margin percentage of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Margin Percentage - YTD Year-to-date margin percentage of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Quantity Forecast quantity of primary baselined forecast version flagged as current.
Current Forecast Quantity - ITD Inception-to-date forecast quantity of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar.
Current Forecast Quantity - PTD Period-to-date forecast quantity of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar.
Current Forecast Quantity - QTD Quarter-to-date forecast quantity of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar.
Current Forecast Quantity - YTD Year-to-date forecast quantity of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar.
Current Forecast Raw Cost - ITD Inception-to-date raw cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Raw Cost - PTD Period-to-date raw cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Raw Cost - QTD Quarter-to-date raw cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Raw Cost - YTD Year-to-date raw cost of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Revenue - ITD Inception-to-date forecast revenue of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Revenue - PTD Period-to-date forecast revenue of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Revenue - QTD Quarter-to-date forecast revenue of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Forecast Revenue - YTD Year-to-date forecast revenue of primary baselined forecast version flagged as current calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Current Versus Original EAC Burdened Cost Variance Variance between current and original estimate at completion primary forecast burdened cost amount.
Current Versus Original EAC Margin Percentage Variance Variance between current and original estimate at completion primary forecast margin percentage.
Current Versus Original EAC Margin Variance Variance between current and original estimate at completion primary forecast margin.
Current Versus Original EAC Raw Cost Variance Variance between current and original estimate at completion primary forecast raw cost amount.
Current Versus Original EAC Revenue Variance Variance between current and original estimate at completion primary forecast revenue amount.
Current Versus Prior EAC Burdened Cost Variance Variance between current and prior estimate at completion primary forecast burdened cost amount.
Current Versus Prior EAC Margin Percentage Variance Variance between current and prior estimate at completion primary forecast margin percentage.
Current Versus Prior EAC Margin Variance Variance between current and prior estimate at completion primary forecast margin.
Current Versus Prior EAC Raw Cost Variance Variance between current and prior estimate at completion primary forecast raw cost amount.
Current Versus Prior EAC Revenue Variance Variance between current and prior estimate at completion primary forecast revenue amount.
EAC Burdened Cost Estimate at completion burdened cost of any baselined forecast version.
EAC Current Equipment Effort Estimate at completion equipment effort of primary baselined forecast version flagged as current.
EAC Current Labor Effort Estimate at completion labor effort for primary baselined forecast version flagged as current.
EAC Current Quantity Estimate at completion quantity of baselined forecast.
EAC Equipment Effort Estimate at completion equipment effort of any baselined forecast version.
EAC Labor Effort Estimate at completion labor effort for any baselined forecast version.
EAC Margin Estimate at completion margin of any baselined forecast version.
EAC Margin Percentage Estimate at completion margin percentage of any baselined forecast version.
EAC Original Equipment Effort Estimate at completion equipment effort of primary baselined forecast version flagged as original.
EAC Original Labor Effort Estimate at completion labor effort for primary baselined forecast version flagged as original.
EAC Original Quantity Estimate at completion quantity of baselined forecast.
EAC Prior Equipment Effort Estimate at completion equipment effort of primary baselined forecast version flagged as prior.
EAC Prior Labor Effort Estimate at completion labor effort for primary baselined forecast version flagged as prior.
EAC Prior Quantity Estimate at completion quantity of baselined forecast.
EAC Quantity Estimate at completion quantity of any baselined forecast.
EAC Raw Cost Estimate at completion raw cost of any baselined forecast version.
EAC Revenue Estimate at completion revenue of any baselined forecast version.
ETC Burdened Cost Estimate to complete burdened cost of any baselined forecast version.
ETC Margin Estimate to complete margin of any baselined forecast version.
ETC Margin Percentage Estimate to complete margin percentage of any baselined forecast version.
ETC Raw Cost Estimate to complete raw cost of any baselined forecast version.
ETC Revenue Estimate to complete revenue of any baselined forecast version.
Forecast Burdened Cost - ITD Inception-to-date burdened cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Burdened Cost - PTD Period-to-date burdened cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Burdened Cost - QTD Quarter-to-date burdened cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Burdened Cost - YTD Year-to-date burdened cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Equipment Effort Equipment effort for any baselined forecast version.
Forecast Labor Effort Labor effort for any baselined forecast version.
Forecast Margin - ITD Inception-to-date forecast margin of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Margin - PTD Period-to-date forecast margin of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Margin - QTD Quarter-to-date forecast margin of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Margin - YTD Year-to-date forecast margin of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Margin Percentage - ITD Inception-to-date margin percentage of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Margin Percentage - PTD Period-to-date margin percentage of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Margin Percentage - QTD Quarter-to-date margin percentage of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Margin Percentage - YTD Year-to-date margin percentage of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Quantity Forecast quantity of any baselined forecast version.
Forecast Quantity - ITD Inception-to-date forecast quantity of any baselined forecast version calculated using the receiver fiscal calendar.
Forecast Quantity - PTD Period-to-date forecast quantity of any baselined forecast version calculated using the receiver fiscal calendar.
Forecast Quantity - QTD Quarter-to-date forecast quantity of any baselined forecast version calculated using the receiver fiscal calendar.
Forecast Quantity - YTD Year-to-date forecast quantity of any baselined forecast version calculated using the receiver fiscal calendar.
Forecast Raw Cost - ITD Inception-to-date raw cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Raw Cost - PTD Period-to-date raw cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Raw Cost - QTD Quarter-to-date raw cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Raw Cost - YTD Year-to-date raw cost of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Revenue - ITD Inception-to-date forecast revenue of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Revenue - PTD Period-to-date forecast revenue of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Revenue - QTD Quarter-to-date forecast revenue of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Forecast Revenue - YTD Year-to-date forecast revenue of any baselined forecast version calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Actual Burdened Cost Actual burdened cost of primary baselined forecast version flagged as original.
Original Actual Margin Actual margin of primary baselined forecast version flagged as original.
Original Actual Margin Percentage Actual margin percentage of primary baselined forecast version flagged as original.
Original Actual Raw Cost Actual raw cost of primary baselined forecast version flagged as original.
Original Actual Revenue Actual revenue of primary baselined forecast version flagged as original.
Original EAC Burdened Cost Estimate at completion burdened cost of primary baselined forecast version flagged as original.
Original EAC Margin Estimate at completion margin of primary baselined forecast version flagged as original.
Original EAC Margin Percentage Estimate at completion margin percentage of primary baselined forecast version flagged as original.
Original EAC Raw Cost Estimate at completion raw cost of primary baselined forecast version flagged as original.
Original EAC Revenue Estimate at completion revenue of primary baselined forecast version flagged as original.
Original ETC Burdened Cost Estimate to complete burdened cost of primary baselined forecast version flagged as original.
Original ETC Margin Estimate to complete margin of primary baselined forecast version flagged as original.
Original ETC Margin Percentage Estimate to complete margin percentage of primary baselined forecast version flagged as original.
Original ETC Raw Cost Estimate to complete raw cost of primary baselined forecast version flagged as original.
Original ETC Revenue Estimate to complete revenue of primary baselined forecast version flagged as original.
Original Forecast Burdened Cost - ITD Inception-to-date burdened cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Burdened Cost - PTD Period-to-date burdened cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Burdened Cost - QTD Quarter-to-date burdened cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Burdened Cost - YTD Year-to-date burdened cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Equipment Effort Equipment effort for primary baselined forecast version flagged as original.
Original Forecast Labor Effort Labor effort for primary baselined forecast version flagged as original.
Original Forecast Margin - ITD Inception-to-date forecast margin of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Margin - PTD Period-to-date forecast margin of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Margin - QTD Quarter-to-date forecast margin of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Margin - YTD Year-to-date forecast margin of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Margin Percentage - ITD Inception-to-date margin percentage of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Margin Percentage - PTD Period-to-date margin percentage of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Margin Percentage - QTD Quarter-to-date margin percentage of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Margin Percentage - YTD Year-to-date margin percentage of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Quantity Forecast quantity of primary baselined forecast version flagged as original.
Original Forecast Quantity - ITD Inception-to-date forecast quantity of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar.
Original Forecast Quantity - PTD Period-to-date forecast quantity of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar.
Original Forecast Quantity - QTD Quarter-to-date forecast quantity of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar.
Original Forecast Quantity - YTD Year-to-date forecast quantity of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar.
Original Forecast Raw Cost - ITD Inception-to-date raw cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Raw Cost - PTD Period-to-date raw cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Raw Cost - QTD Quarter-to-date raw cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Raw Cost - YTD Year-to-date raw cost of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Revenue - ITD Inception-to-date forecast revenue of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Revenue - PTD Period-to-date forecast revenue of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Revenue - QTD Quarter-to-date forecast revenue of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Original Forecast Revenue - YTD Year-to-date forecast revenue of primary baselined forecast version flagged as original calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Actual Burdened Cost Actual burdened cost of primary baselined forecast version flagged as prior.
Prior Actual Margin Actual margin of primary baselined forecast version flagged as prior.
Prior Actual Margin Percentage Actual margin percentage of primary baselined forecast version flagged as prior.
Prior Actual Raw Cost Actual raw cost of primary baselined forecast version flagged as prior.
Prior Actual Revenue Actual revenue of primary baselined forecast version flagged as prior.
Prior EAC Burdened Cost Estimate at completion burdened cost of primary baselined forecast version flagged as prior.
Prior EAC Margin Estimate at completion margin of primary baselined forecast version flagged as prior.
Prior EAC Margin Percentage Estimate at completion margin percentage of primary baselined forecast version flagged as prior.
Prior EAC Raw Cost Estimate at completion raw cost of primary baselined forecast version flagged as prior.
Prior EAC Revenue Estimate at completion revenue of primary baselined forecast version flagged as prior.
Prior ETC Burdened Cost Estimate to complete burdened cost of primary baselined forecast version flagged as prior.
Prior ETC Margin Estimate to complete margin of primary baselined forecast version flagged as prior.
Prior ETC Margin Percentage Estimate to complete margin percentage of primary baselined forecast version flagged as prior.
Prior ETC Raw Cost Estimate to complete raw cost of primary baselined forecast version flagged as prior.
Prior ETC Revenue Estimate to complete revenue of primary baselined forecast version flagged as prior.
Prior Forecast Burdened Cost - ITD Inception-to-date burdened cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Burdened Cost - PTD Period-to-date burdened cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Burdened Cost - QTD Quarter-to-date burdened cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Burdened Cost - YTD Year-to-date burdened cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Equipment Effort Equipment effort for primary baselined forecast version flagged as prior.
Prior Forecast Labor Effort Labor effort for primary baselined forecast version flagged as prior.
Prior Forecast Margin - ITD Inception-to-date forecast margin of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Margin - PTD Period-to-date forecast margin of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Margin - QTD Quarter-to-date forecast margin of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Margin - YTD Year-to-date forecast margin of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Margin Percentage - ITD Inception-to-date margin percentage of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Margin Percentage - PTD Period-to-date margin percentage of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Margin Percentage - QTD Quarter-to-date margin percentage of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Margin Percentage - YTD Year-to-date margin percentage of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Quantity Forecast quantity of primary baselined forecast version flagged as prior.
Prior Forecast Quantity - ITD Inception-to-date forecast quantity of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar.
Prior Forecast Quantity - PTD Period-to-date forecast quantity of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar.
Prior Forecast Quantity - QTD Quarter-to-date forecast quantity of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar.
Prior Forecast Quantity - YTD Year-to-date forecast quantity of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar.
Prior Forecast Raw Cost - ITD Inception-to-date raw cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Raw Cost - PTD Period-to-date raw cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Raw Cost - QTD Quarter-to-date raw cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Raw Cost - YTD Year-to-date raw cost of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Revenue - ITD Inception-to-date forecast revenue of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Revenue - PTD Period-to-date forecast revenue of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Revenue - QTD Quarter-to-date forecast revenue of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.
Prior Forecast Revenue - YTD Year-to-date forecast revenue of primary baselined forecast version flagged as prior calculated using the receiver fiscal calendar. This metric is available in project ledger currency, project currency, and Analytic Currency only.

PPM - Project Funding

These metrics are used in the Analytics Currency (AC) and Contract Currency (CC) fact folders. Analytics currency and exchange rate type are configured during product implementation. Exchange rate date basis uses contract line start date to convert from contract currency to analytics currency. Metrics in these folders show amounts in their respective currencies.

Metric Metric Definition
Backlog Amount Backlog amount is calculated as funding amount - revenue amount.
Contract Amount Shows the contract amount.
External Contract Amount Shows the contract amount for external contracts.
Funding Amount Funding amount allocated to the project.
Intercompany Contract Amount Shows the contract amount for intercompany contracts.
Interproject Contract Amount Shows the contract amount for interproject contracts.
Invoice Amount Invoiced amount for the contract.
Quantity Shows the contract line quantity.
Revenue Amount Revenue recognized for the contract.
Unallocated Amount Unallocated amount calculated as contract amount - funding amount.

PPM – Project Labor Distribution Costs (Preview)

These metrics are used in the Document Currency (DC) fact folder in the Subject Area.

Metric Metric Definition
Labor Cost Amount This metric shows the Payroll labor Cost amount.
Distribution Amount This metric shows the distribution cost amount allocated based on the labor schedule rule.
Line Percentage This metric shows the allocation percentage used for generating the labor distribution based on the labor scheduled rule.

PPM - Project Labor Schedules (Preview)

These metrics are in the Facts - Labor Schedules folder in the Subject Area.

Metric Metric Definition
Line Percentage This metric shows the Line Percentage in the Labor Schedule Distribution Rule.
Number of Versions This metric shows the number of Labor Schedule versions defined.
Number of Distribution Rules This metric shows the number of Distribution Rules in the Labor Schedule.

PPM - Project Invoices

These metrics are used in the Analytics Currency (AC), Document Currency (DC), Contract Currency (CC), Project Currency (PC), Ledger Currency (LC), Project Ledger Currency (PLC), and Invoice Currency (IC) fact folder in subject area. Ledger Currency and Project Currency amounts will be available only for Invoices with Accepted Status. Analytics currency and exchange rate type are configured during product implementation. Exchange rate date basis uses Invoice Currency Conversion Rate Date if this date is populated, and if not available, uses invoice date to convert to analytics currency. Metrics in these folders show amounts in their respective currencies.

Metric Metric Definition
Billed Quantity Shows the Billed Quantity.
Canceled Amount Canceled Amount shows the Invoice amount for Invoices with type Canceled invoice.
Concession Amount Concession Amount shows the Invoice amount for Invoices with type Concession invoice.
Credit Memo Amount Credit Memo Amount shows the Invoice amount for Invoices with type Credit Memo.
External Invoice Amount - ITD Inception to Date External Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
External Invoice Amount - PTD Period to Date External Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
External Invoice Amount - QTD Quarter to Date External Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
External Invoice Amount - YTD Year to Date External Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
External Invoice Amount  Invoice amount from External contracts.
Intercompany Invoice Amount Invoice amount from Intercompany contracts.
Intercompany Invoice Amount - ITD Inception to Date Intercompany Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Intercompany Invoice Amount - PTD Period to Date Intercompany Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Intercompany Invoice Amount - QTD Quarter to Date Intercompany Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Intercompany Invoice Amount - YTD Year to Date Intercompany Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Invoice Amount Invoice amount from Interproject contracts.
Interproject Invoice Amount - ITD Inception to Date Interproject Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Invoice Amount - PTD Period to Date Interproject Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Invoice Amount - QTD Quarter to Date Interproject Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Invoice Amount - YTD Year to Date Interproject Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Invoice Amount - ITD Inception to Date Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Invoice Amount - PTD Period to Date Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Invoice Amount - QTD Quarter to Date Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Invoice Amount - YTD Year to Date Invoice Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Invoice Amount  Contract Invoice Amount.
Write-Off Amount Write-off Amount shows the Invoice amount for Invoices with type Write-off invoice.

PPM - Project Revenue

These metrics are used in the Analytics Currency (AC), Document Currency (DC), Contract Currency (CC), Project Currency (PC), Ledger Currency (LC), Project Ledger Currency (PLC), and Revenue Currency (RC) fact folders in subject areas. Analytics currency and exchange rate type are configured during product implementation. Exchange rate date basis uses ledger currency conversion rate date if this date is populated, and if not available uses transaction date to convert to analytics currency. Metrics in these folders show amounts in their respective currencies.

Metric Metric Definition
Credit Amount Shows the credit amount of the revenue accounting distribution. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Debit Amount Shows the debit amount of the revenue accounting distribution. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
External Revenue Amount Revenue recognized from external contracts.
External Revenue Amount - ITD Inception to Date Revenue amount from External Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
External Revenue Amount - PTD Period to Date Revenue amount from External Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
External Revenue Amount - QTD Quarter to Date Revenue amount from External Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
External Revenue Amount - YTD Year to Date Revenue amount from External Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, Project Ledger Currency, and Analytic Currency only.
Intercompany Revenue Amount Revenue recognized from intercompany contracts.
Intercompany Revenue Amount - ITD Inception to Date Revenue amount from Intercompany Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Intercompany Revenue Amount - PTD Period to Date Revenue amount from Intercompany Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Intercompany Revenue Amount - QTD Quarter to Date Revenue amount from Intercompany Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Intercompany Revenue Amount - YTD Year to Date Revenue amount from Intercompany Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Revenue Amount Revenue recognized from interproject contracts.
Interproject Revenue Amount - ITD Inception to Date Revenue amount from Interproject Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Revenue Amount - PTD Period to Date Revenue amount from Interproject Contracts. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Revenue Amount - QTD Quarter to Date Revenue amount from Interproject Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Interproject Revenue Amount - YTD Year to Date Revenue amount from Interproject Contracts calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Net Amount Shows the net amount of the revenue accounting distribution. This metric is available in ledger currency, Document Currency, and Analytic Currency only.
Revenue Amount Contract revenue amount.
Revenue Amount - ITD Inception to Date Contract Revenue Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Revenue Amount - PTD Period to Date Contract Revenue Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Revenue Amount - QTD Quarter to Date Contract Revenue Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Revenue Amount - YTD Year to Date Contract Revenue Amount calculated using the Receiver Fiscal Calendar. This metric is available in Ledger Currency, Project Currency, and Analytic Currency only.
Revenue Recognized Quantity Revenue recognized quantity.
Unaccounted Count Count of revenue distributions that are not accounted.