Project Cost Fact

Actual project costs are extracted from the Cost Distribution Lines table in the Oracle E-Business Suite Project Costing module and loaded into the Project Cost Line Fact table (W_PROJ_COST_LINE_F).

For the Oracle E-Business Suite source systems, the Transaction Currency stored in the fact table corresponds to the Document Currency of the source transaction.