Customers Using Planning

For those Planning customers using Data Integration, here are key considerations:

  • Partial Data Loads—When loading data, all valid data will be loaded. For example, if some of the data does not pass any cell level validation rules, then that data will not be loaded, but all other valid data will be loaded. A partial load will be reflected as a failed integration, but all valid data will be loaded. If users are defined as an administrator, then cell level validations will be ignored, and the data will be loaded.

  • If you use an "all data type load" type load, you can create a job in Planning by selecting Yes for All Data Type Load Using Jobs in System Settings. See System Settings.

  • When a customer selects All data types with security as a target option, the system loads numeric data, text, Smartlist, and Date data types. If the Planning administrator loads data, Planning data security is not enforced. If a Planning non-administrator user loads data, then Planning data security is enforced. A Planning non-administrator user can load only 500,000 cells of data.