Redwood Experience: Estimated Time to Hire in Job Requisition Creation Flow
You can now view the estimated time to hire while creating a job requisition in Redwood.
If you change the value of attributes like Requisition Title and Primary Location to improve the estimates, the modified values are updated automatically in the Basic info and Requisition structure sections. This is new in Redwood.
Estimated Time to Hire Section in New Job Requisition Flow
With this feature, you have the flexibility to change attributes like Requisition Title, Education Level, Primary Location, and verify if the estimates are modified while creating the requisition. You don’t have to wait for the requisition to be approved to modify the attributes.
Steps to Enable
To enable the Estimated time to hire feature in Redwood, you need to enable these profile options:
- ORA_IRC_RECRUITING_REDWOOD_ENABLED
- ORA_IRC_REQUISITION_REDWOOD_ENABLED
- ORA_IRC_CREATE_REQUISITION_ REDWOOD_ENABLED
For details, see How do I enable a profile option?
For more info on how to set up Time to Hire, see these topics:
By default, in Redwood, the Estimated time to hire section isn't displayed in job requisitions. To display it in Redwood, you need to use Visual Builder Studio Express mode. For details, see How do I make a section visible in Visual Builder Studio?
For more details on enabling Redwood for HCM, see How do I adopt Redwood for HCM? and Extending Redwood Applications for HCM and SCM Using Visual Builder Studio.