Use the Print Electronic Production Records scheduled process to generate a summary of a product's production record based on its work order, including its complete production and quality history.

  • You can run this scheduled process from the Work Execution work area task list to print production records for a single work order or for multiple work orders.
  • You also can run this process directly from the Scheduled Processes UI.
  • You can run the process only when work orders are in either a closed or a completed status.
  • The process uses a default template to generate the documents.

    You can customize the template to add or remove attributes from the predefined attribute list, or to change the layout of the report.

When to Use

Run this scheduled process only after you ensure that the manufacturing work order for a given product is in either a closed or completed status.

Privileges Required

  • Print Electronic Production Records (WIP_PRINT_ELECTRONIC_PRODUCTION_RECORDS_PRIV)

Specifications

Specification Description
Job Type Scheduled or as needed.
Frequency As required.
Time of Day Any time.
Duration Varies, based on the volume of data records.
Compatibility There can be multiple instances running at the same time for separate work orders.

Parameters

Parameter Optional or Required Description Parameter Value Special Combinations Required
Organization Required Organization Code Example: ORG1 None
From Work Order One of the two parameters is required From work order number Example: WO1001 None
To Work Order One of the two parameters is required To work order number Example: WO1002 Defaulted from ‘From Work Order’
Work Order Status Required Status of the Work order All applicable seeded and custom work order statuses None

Troubleshooting Information

  • You can view the status of the Print Electronic Production Records process on the Scheduled Processes UI.
  • Any report-generation errors will display in error log.
  • After you submit the scheduled process, you can perform any of these tasks in the Scheduled Processes UI:
    • Resubmit it
    • Put it on hold
    • Cancel it