How You Create a Configured Item Work Definition
Configure to Order (CTO) is the process of ordering and fulfilling configured products. The configured products, also referred as configured items, are either procured or made to order. The configured item work definition defines the manufacturing process to build the configured item.
Configured item work definitions are currently supported for only discrete manufacturing.
Process to Create a Configured Item Work Definition
When Oracle Manufacturing receives a request to create a work order for the configured item:
-
First, it creates the configured item work definition.
-
Then, based on the configured item work definition, it creates the configured item work order
A configured item work definition is created dynamically using the primary ATO model work definition, selected options, and transactional item attributes. Unlike the ATO model work definition, the configured item work definition isn't saved in the database. Also, you can't create a work definition for a configured item manually or search for it in the user interface.
Example to Create a Configured Item Work Definition
The following example illustrates how a configured item work definition is created.
The following shows how a configured item is created from the item structure:
-
ATO MODEL 1
-
OPTION CLASS 1
-
OPTION 11: (selected option: Y)
-
OPTION 12
-
MANDATORY COMP 13
-
-
OPTION CLASS 2
-
OPTION 21: (selected option: Y)
-
OPTION 22
-
MANDATORY COMP 23 (Phantom)
-
-
-
MANDATORY COMP 23
-
COMP 231
-
COMP 232
-
The following table illustrates the various attributes of the work definition for ATO Model 1:
Operation Sequence |
Operation Name |
Option Dependent |
Operation Item |
Applicability Rule |
---|---|---|---|---|
10 |
Assembly |
N |
MANDATORY COMP 3 OPTION CLASS 1 |
Blank |
20 |
Hand insertion |
Y |
OPTION CLASS 2 |
Blank |
30 |
Performance Test A |
Y |
Blank |
If OPTION 21 is selected |
40 |
Performance Test B |
Y |
Blank |
If OPTION 22 is selected |
50 |
Pack |
N |
MANDATORY COMP 4 |
Blank |
The following table illustrates the various attributes of the work definition for configured item ATO Model 1:1:
Operation Sequence |
Operation Name |
Operation Item |
---|---|---|
10 |
Assembly |
MANDATORY COMP3 OPTION 11 |
20 |
Hand insertion |
OPTION 21 COMP 231 COMP 232 |
30 |
Performance Test A |
Blank |
50 |
Pack |
MANDATORY COMP 4 |
-
The quantity recorded on the sales order is the quantity that's used for selected options and child ATO models.
-
The quantity defined in Oracle Fusion Product Model is the quantity that's used for mandatory component.