- Owner's Guide
- Site Preparation
3 Site Preparation
Learn about site preparation requirements for the Oracle Database Appliance before installing it into a rack and cabling it.
- Prepare Your Site
 Use this procedure before installing the appliance into a rack.
Prepare Your Site
Use this procedure before installing the appliance into a rack.
- Ensure that your site meets the environmental requirements in Environmental Specifications.
- Ensure that your site meets the electrical specifications in Electrical Specifications.
- Ensure that your site has adequate clearance for the shipping containers.
- Allow the equipment to acclimatize to the computer center environment.If significant temperature differences exist (> 10° C / 18° F) between the new system and the designated computer center, the equipment should be left in its boxes for a sufficient period of time to allow the temperature of the equipment to come to within a few degrees of the computer center. Caution: Equipment damage. The system should never be powered on unless it is within the supported operating range (temperature and humidity). 
- Open the shipping containers.You should do this at the location where the system will be installed, but outside of the computer center itself. Caution: Equipment damage. Use a separate area in which to remove the packaging material to reduce particle contamination before entering the computer center. 
- Check the contents of the shipping container.Caution: System failure. All items in a shipment are designed to be used together as a single system. Do not mix components from different shipments; this could cause the system to fail. It should contain: Oracle Database Appliance X10-S/X10-L Oracle Database Appliance X10-HA - 
                                                
                                                Preconfigured system 
- 
                                                
                                                Accessory kit, including: - 
                                                      
                                                      Setup poster 
- 
                                                      
                                                      Safety and legal documentation 
- 
                                                      
                                                      Rackmount guide and alignment template 
- 
                                                      
                                                      Rackmount kit 
 
- 
                                                      
                                                      
- 
                                                
                                                Power cords (shipped separately) 
- 
                                                
                                                Shipping kit (optional) 
 - 
                                                
                                                The server nodes include: - 
                                                      
                                                      Preconfigured server nodes (0 and 1) 
- 
                                                      
                                                      Accessory kit, including: - 
                                                            
                                                            Setup poster 
- 
                                                            
                                                            Safety and legal documentation 
- 
                                                            
                                                            Rackmount guide and alignment template 
- 
                                                            
                                                            Rackmount kit 
- 
                                                            
                                                            Power cords 
- 
                                                            
                                                            SAS cables, Ethernet cables, cluster cables, and labels are shipped with the storage shelf. 
 
- 
                                                            
                                                            
 
- 
                                                      
                                                      
- 
                                                
                                                The storage shelf includes: - 
                                                      
                                                      Preconfigured storage shelf 
- 
                                                      
                                                      Rackmount kit 
- 
                                                      
                                                      Power cords 
- 
                                                      
                                                      Cables 
- 
                                                      
                                                      Setup poster 
 
- 
                                                      
                                                      
- 
                                                
                                                If you ordered a storage expansion shelf, it is shipped separately and includes the same list of components as the storage shelf. 
 
- 
                                                
                                                
Parent topic: Site Preparation