3.5 Initial Configuration on APPD
This procedure sets the ELAP initial configuration parameters and prepares the new MPS-A and MPS-B servers for network access.
If exiting switches are used then the provisioning should be stopped at this point to avoid data loss. The anticipated down time for provisioning is expected to last approximately 5 hours.
Note:
After IPM, switch configuration should be done before initial configuration. Follow ELAP Incremental Upgrade/Installation guide for ELAP 10.2, Procedure 8 (CGBU_046632) for switch configuration steps.