A.1 TELCO TO CISCO SWITCH REPLACEMENT

Table A-1 TELCO TO CISCO SWITCH REPLACEMENT

STEP # This procedure is for replacing the Telco switch with the Cisco switch. Check off (✓ )each step as it is completed. Boxes have been provided for this purpose under each step number. IF THIS PROCEDURE FAILS, CONTACT MY ORACLE SUPPORTAND ASK FOR ASSISTANCE.

The following tools are required to perform this procedure:

• Ground Strap (Wrist or Heel)

• #2 Phillips Screwdriver

• #3 Phillips Screwdriver

• 1/4” Nut Driver or Socket

• 5/16” Nut Driver or Socket

• Diagonal Wire Cutter (to cut Tie-wraps)

• Multi Meter

• Tie Wraps

• Electrical Tape

• Cable Tags/Marker (to label all cables)

1.

☐

Disable and disconnect switch power

Tools required: Ground Strap, #2 Phillips Screwdriver, Multi Meter, and Diagonal Wire Cutter

a. At the fuse panel, locate the fuse positions for the switch being removed. To power down the Switch, remove the fuses for both A and B feeds.

b. Once the switch is off, unscrew and remove the terminal-block insulator covers from both terminals blocks A and B.

c. With covers removed, using a Multi Meter, ensure that there is no power.

d. Ensure that the power leads are marked -48V & RTN.

e. With the cables marked, one at a time, remove the power cable and tape the terminal ring. Repeat these steps until all power connections are removed.


Switch rear connections with insulator screws labeled.

Note: This procedure will reference replacing the Switch #1 location (top). Same procedure is applicable for other switch locations.


Switch rear connections with cable ties marked.

Note: For the replacement switch, if required, more cable slack/length can be added if the cable-ties are cut from the Tie-rod. See Step 8.

2.

☐

Disconnect ground cable from switch

Tools required: Ground Strap and 5/16" Nut Driver or Socket

a. Remove the Switch Ground Wire from the grounding point, by loosening and removing Hex nut, Flat washer, and External tooth washer.

b. Leave Ground Wire dangling. Do not disconnect ground wire attached to cabinet/frame.

Note: Hardware removed, nut, and washers are NOT required on the replacement switch.


Switch ground wire connection marked on the rear panel.

3.

☐

Disconnect Front ENET and Console

Cables

Tools required: Diagonal Wire Cutters

Note: This procedure will reference replacing the Switch #1 location (Top). The same procedure used for other switch locations.

  • Make sure that all the cables are labeled and are in the correct position that they are terminated at. If not, ensure to mark or label before starting any removal.
  • Disconnect the Console and Ethernet cables from Telco switch being replaced. Leave the cables dangling.
  • (Optional) If cable management tie-rod is mounted to the switch being replaced, it may be necessary to cut or remove the cable-ties, holding the cables from the Tierod.

Switch console cable, Ethernet cables, cable ties, and tie rod labeled.

4.

☐

Remove the Switch being replaced

Tools required: Ground Strap and #3 Phillips Screwdriver

  • Remove the four (4) PAN head screws (Two (2) on either side of the switch). If there is no support under the switch, take care to support the switch while removing the screws.
  • Remove the Switch from the Eagle rack.
  • Keep the screws safely set aside. Required for mounting the new switch.

Note: If Tie-rod is attached via the screws being removed, then the Tie-rod needs to be set aside for reattachment when the replacement Switch is installed.


Switch mounting screws, extension flange bracket, and tie rod labeled.

5.

☐

Assemble the replacement Cisco Switch

Tools required: Ground Straps and #2 Phillips Screwdriver

Attach the mounting brackets with Cisco switch assembly.

  • Locate the supplied mounting brackets and screws from the Switch package.

    Cisco switch mounting brackets and their label positions.

  • Align the mounting bracket to the switch using four mounting holes.

    Note: Bracket with labels to be mounted on the right side of the switch.

  • Insert four screws, supplied with each switch, and tighten.

    Replacement switch screw packets and cable manager components.

  • Repeat the steps b and c for the other side of the switch.
  • Attach optional Cable Manager.
    • Locate Cable Manager and Screw from replacement Switch packaging.
    • Attach the Cable Manager to the rack mounting bracket using the supplied screw.

Cisco switch cable manager and mounting screw.

6.

☐

Install

Replacement

Cisco Switch

Tools required: Ground Straps and #3 Phillips Screwdriver

  • Align Replacement Cisco Switch in the slot where the original switch was removed.

    Replacement Cisco switch installed with mounting screws and tie rod labeled.

  • Using screws removed from step 4, insert the four (4) PAN head screws (Two (2) on either side of the switch) and tighten.

Note: If Tie-rod was removed in step 4, reattach at this time.

7.

☐

Reattach the ground cable

Tools required: Ground Straps and #2 Phillips Screwdriver

Reattach the chassis ground wire (from Step 3) to switch where shown. Use Screws provided with replacement Cisco Switch.


Rear switch grounding screws and ground wire.

In Replacement Switch Container, locate grounding screw packet with PN 48-2381-01.


Packet of switch grounding hardware.

8.

☐

Connect power to the replacement Cisco Switch

Tools required: Ground Strap and 1/4” Nut Driver

  • Remove terminal block cover.

    Power terminal block components including cable lug, washers, nut, and cover.

  • Remove Nuts and Washers from studs on A feed terminal block.

  • Install the lugs from the power cable (A) to switch terminal block A.
  • Secure the nuts after inserting flat washer and lock washer on top of the cable lug.
  • Ensure connections to terminal block are as follows: SW RTN wire to "+" terminal, SW -48V wire to "-" terminal.

    Switch A and B power wiring with return and minus 48 volt terminals labeled.

  • Reattach protective cover.
  • Repeat the above steps for the B feed connection.

9.

☐

Reattach Console Cable and Ethernet

Cables

Tools required: Ground Strap

  • Plug-in the console port cable to the Replacement Switch.

    Front and rear switch views showing Telco and Cisco console ports.

    Note: The Console port on the New Cisco Switch is on the rear side where the power is applied.

  • Plug-in the Ethernet cables to Replacement Cisco Switch.

    Note: The Switch locations are marked on cable from Step 3.

10.

☐

Reapply power

  • Double check all the connections are in their proper place and are secure.
  • Reinstall the A and B feed power fuses (removed in Step 1) one at a time.
  • Check the switch power supply LED to ensure power is up. Then, install the other fuse and again check power supply LED.

    Rear switch power supplies with illuminated indicators.

The replacement switch is now ready to be set up and configured.

11.

☐

Configure the new Cisco Switch