4 Oracle Communications Server E6-2L Platform Preparation
Oracle Communications Session Router and Enterprise Session Router run on the Communications Server E6-2L platform. See the Release Notes for more information about which products run on which platforms.
- Server specifications and requirements
- Server components, including front and back panel features
- Rack installation procedures
- Cabling procedures
- Connecting and using Oracle Integrated Lights Out Manager (ILOM)
Before installing the software, you must prepare your installation media on a separate machine:
- On your local machine, download the appropriate release of the Session Router software.
- Prepare your installation media in one of the following ways:
- To install from USB, use the filename that begins with the software version and appended with the suffix -img-usb.exe. Create a USB flash drive as described in Flash Drive Installation via Boot Media Creator, and insert it into the USB port on the Oracle Communications Server E6-2L.
- To install using ILOM, use the filename that begins with the software version and appended with the suffix -img.iso. Use the ILOM Remote System Console Redirection page to connect to your local machine.
See Oracle ILOM Administrator's Guide for Configuration and Maintenance Firmware for information about setting up and using the ILOM Remote System Console.
Note:
The ILOM Remote System Console requires Java Runtime Environment and JDK. See Requirements for Using the Oracle ILOM Remote System Console in Oracle ILOM Administrator's Guide for Configuration and Maintenance Firmware for information about which versions to use and how to register the JDK plugin in your web browser. - To install using a management device connected directly to the NET MGMT (wancom0) port, transfer the file that begins with the software version and uses the .bz extension to the management device.
The following sections describe the available connections and give steps for setting up the platform and installing the Session Router software.
Available E6-2L Connections and Ports
The Oracle Communications Server E6-2L provides the connections described in the following table.
For labeled diagrams and full descriptions of each port, see E6-2L Back Panel Features and E6-2L Back Panel Connectors and Ports Oracle Communications Server E6-2L Installation Guide. Review this information before cabling the server.
The following configurations are available on the Oracle Communications Server E6-2L for Session Router:
- Configuration 1:
- Oracle Dual Port 25 /100 Gb Mellanox Ethernet Adapter v2, used for wancom1 and wancom2 interfaces
- Intel X710 Quad Port 10G module, used for s0p0, s1p0, s0p1, and s1p1 interfaces
- Configuration 2:
- Oracle Dual Port 25 /100 Gb Mellanox Ethernet Adapter v2, used for wancom1 and wancom2 interfaces
- Oracle Quad Port 10GBase-T Adapter v3, used for s0p0, s1p0, s0p1, and s1p1 interfaces
Caution:
Do not use the Mellanox Ethernet Adapter for media interfaces. Session Router only supports management interfaces for Mellanox.The following table describes the ports that you can use for connecting the Oracle Communications Server E6-2L, their descriptions, and what you need to make the connection.
| Port | Description | You Need: |
|---|---|---|
| NET MGT |
Provides a 100/1000 BASE-T Ethernet connection to the Service Processor (SP) through an RJ-45 connector. The NET MGT port provides support connections to the SP using the Oracle Integrated Lights Out Manager (ILOM) CLI and Web interface. By default, the NET MGT port is configured to use DHCP to automatically obtain an IP address. Alternatively, you can assign a static IP address to the NET MGT port. To use the NET MGT port, you must configure its network settings. When configured, use the NET MGT port IP address to log on to the device using a browser or secure shell. |
|
| NET 0 |
The host management 1GBe 100/1000BASE-T Gigabit Ethernet (GbE) port enables you to connect the Oracle Communications Server E6-2L to your network through an RJ-45 connector. |
|
| SER MGT (COM1) |
Provides serial connection to the SP through an RJ-45 connector. SER MGT (COM1) connects to either Service Processor by default, but can be redirected to the host. Default settings:
|
|
| USB | Provides USB 3.1 connection to the computer. You can connect and disconnect USB cables to the USB port without affecting server operations. | Installation media
Note: The maximum USB cable length is 5 meters. |
Oracle Communications Server E6-2L Installation Overview
Installing and preparing Oracle Communications Server E6-2L for Session Router involves the following tasks:
- Cabling the server (NICs, administration console, and ILOM connection)
- Configuring BIOS settings.
- Installing Session Router software.
- Formatting the disk.
- Post-installation tasks:
- Setting up interface mapping.
- Configuring the Session Router as needed.
Cable the Oracle Communications Server E6-2L
After mounting the Oracle Communications Server E6-2L in an equipment rack and installing all components, use the following instructions to connect all appropriate data cables to the ports before powering the system up and beginning the configuration.
Oracle recommends using category 6 (or better) Ethernet cables for all Ethernet connections.
To cable the Oracle Communications Server E6-2L:
- Locate all appropriate cables to connect to the Oracle Communications Server E6-2L.
- Cable the NICs. You do not need to use every port for proper operation.
- Connect wancom1 and wancom2 to the first two ports in the Mellanox NIC.
- Connect s0p0, s1p0, s0p1, and s1p1 to the ports in the X710 or Oracle Quad Port Base-T NIC.
Caution:
Do not use the Mellanox Ethernet Adapter for media interfaces. Session Router only supports management interfaces for Mellanox. - Cable the Oracle Integrated Lights Out Manager (ILOM) connection by doing one of the following:
- For a local serial connection, using the ILOM CLI on a terminal device, connect a serial console cable with an RJ-45 connector to the SER MGT (COM1) port.
- For remote network management, using the ILOM UI on a web browser, connect an Ethernet cable to the NET MGT port.
For more information about these options and how to connect to the server with ILOM, see Server Management Connection Options and Using Oracle Integrated Lights Out Manager (ILOM) in Oracle Communications Server E6-2L Installation Guide.
- Lead all cables neatly away from the rear panel. Keep Ethernet cables separated from power cables by at least 60mm where possible and never run them in the same channel of the rack without segregation.
- Connect cables to their respective destination components.
Configure Oracle Communications Server E6-2L BIOS Settings
To support Session Router, you must configure Oracle Communications Server E6-2L BIOS settings as follows:
Install the Software on Oracle Communications Server E6-2L
After cabling the Oracle Communications Server E6-2L and configuring BIOS settings, you must install the Session Router software. This procedure assumes you have already prepared and connected your installation media and are still in the BIOS menu.
Format the Oracle Communications Server E6-2L Disks
After installing Session Router on the Oracle Communications Server E6-2L platform, when the system boot the Session Router for the first time, you must format the system and data disks.
Oracle Communications Server E6-2L includes two 480GB M.2 NVME SSDs. You format one as the system disk and the other as the data disk. After formatting, the system disk includes the /boot, /code, and /opt partitions. The data disk includes the /mnt/sys and /mnt/app partitions.
To format the disks:
- Format the system disk by running format system-disk. When prompted, accept the defaults.
- Format the data disk by running format data-disk. When prompted, accept the defaults.
You can run show space command with the hard-disk, system-disk, data-disk arguments to display the partition details. The following is sample output from the show space hard-disk command immediately after formatting:
Mount Size Used Avail Use%
/boot 1.9GB 776.8MB 1.1GB 40%
/code 1.8GB 336.0KB 1.8GB 0%
/opt 435.4GB 100.2MB 435.3GB 0%
/mnt/sys 351.0GB 1.0MB 351.0GB 0%
/mnt/app 3.1TB 1.0MB 3.1TB 0%After formatting, you do not need to power cycle the system. Continue to the next task, Next Steps After the Software Installation on Oracle Communications Server E6-2L.