Deliverables Information
When PPM Deliverables are mapped to P6Foot 1, the bridge can be set such that changes in the start and finish dates or Activity % Complete of the corresponding milestone activity in P6 will be reflected respectively in the deliverable Due Date and CompletedFoot 2 fields in PPM during the next manual update or sync operation. The following table shows the deliverable fields that are updated.
| P6 Milestone Field | PPM Deliverable Field |
|---|---|
| Start and finish dates | Due Date |
| Activity % Complete | Completed |
The following sections describe how to update PPM information from P6.
To update from P6:
- Navigate to the item or portfolio of items you want to update. You may wish to note the phase and other updateable information.
- From the Tools menu, select Update from PM. A confirmation dialog box appears.
- Click Continue. A progress indicator appears.
- After the update process is finished, one of two types of messages appear:
- Update succeeded: All information was updated successfully.
- Update failed (or some of the information failed to update): In this case, follow the instructions in the message.
Note:
You will receive an error message if some of the selected items are not mapped to a project.
- Click OK to close the dialog box. The project is now updated.
Footnote Legend
Footnote 1: Either because the initial publishing of the item was based on the PPM items phase and deliverable content, or if published based on a P6 methodology, where the methodology contains a WBS element with a milestone activity which are named identically as one of the item’s phases and its deliverable, respectively.Footnote 2: If the deliverable milestone percent complete in project is 100% then the Deliverable Completed checkbox in PPM is checked. If the percent complete is less than 100%, the checkbox is not checked.