Create or Update Timeline Charts
Create Timeline charts to visualize data points or events over an extended length of time in a chronological order.
To create Timeline charts for visualizations:
- Sign in to Unifier with company administration credentials.
- Go to the Company Workspace tab, and switch to Admin mode.
- In the left Navigator, select Visualizations, and then select Content.
- In the Content log (right pane), select Create.
- In the Create page, specify the following information:
- From the Preview Project list, select an active project/shell, and select Preview Data to preview the data you can use to create the chart.
- From the Data Source list, select the data source to use for creating the content item.
- From the View Type list, select Timeline Chart.
- In the Name field, enter a name for the Timeline chart.
Note:
The combination of Name and View Type field values must be unique.
- (Optional) In the Description field, enter a short description about the Timeline chart.
- From the Event Type list, select Single Event (default) or Duration Event.
- If you chose Single Event, from the Category (Time Axis), select a date type data element that defines the event timeline.
- From the Event Title list, select a data element that can be used as the title for the timeline event.
- From the Event Detail list, select a maximum of two event details to track in the Timeline chart.
- To add another event detail, click Add.
- To remove an event detail and its associated data element, click Delete (x).
- If you chose a Duration Event, in the Event Duration field, select a date or date/time data element to choose the start date and end date of the duration of the Timeline chart.
- From the Color By list, select a data element to measure using a color-code. To remove a color code and the associated data element, click Delete (x).
- From the Orientation list, select Vertical or Horizontal (default).
- In the Timeline Overview field, toggle to hide or display a compressed overview of the entire timeline.
- In the Tooltip field, toggle to hide or display tooltips when you hover over events on the Timeline chart.
- Make changes as needed to refine the above selections.
- After making all changes, perform any of the following actions:
- To save the chart in a Draft status, select Create Draft, and return to the Content log.
- To save additional changes made to an existing chart in Draft status, select Update Draft.
- To delete the chart, select Cancel. You will lose all unsaved changes made to the chart.
- To make the chart available to your users for data visualizations, select Publish, and return to the Content log.