Activity Sheet Created from Oracle Primavera Cloud Project through Gateway
When you create an Activity Sheet by way of integration with Oracle Primavera Cloud, you can assign CBS codes to the Activity Sheet.
In the Activity Sheet log, select the activity that you want.
Select the gear menu (
), and select one of the following options:
- Assign CBS Code
- Remove CBS Code
In the Activity Attribute Form, the General tab displays the associated CBS code.
For details about the functionality for assigning, updating, and removing CBS code from an activity (in Activity Sheet) from P6 using both non-EVM and EVM synchronizations, see Activity Sheet Created from P6 through Gateway.
Using CSV import to assign CBS Code to multiple activities
In an Activity Sheet with all the schedule types, you have the option to import CSV to multiple activities, in bulk.
To import the CSV template to multiple activities:
- Select Actions.
- Select Update Data.
- Select Activities.
- Select Import CSV.
You can export the CSV template, using Export CSV, and bulk assign the CBS codes to multiple activities, in Duration-based schedules.
All validations (CBS codes, active, and inactive CBS codes) regarding the assigning of the CBS codes to multiple activities take place during the CBS code assignment.