Activity Sheets Log (System Activity Sheet Gear Menu)
To access the Activity Sheets log:
- Go to the shell tab, and switch to User mode.
- In the left Navigator, select Activity Manager, and then select Activity Sheets to access the Activity Sheets log.
The log lists the System Activity Sheet as well as the manual activity sheets.
The System Activity Sheet has a gear menu (
) which enables you to open (Open) the System Activity Sheet.