Activity Sheets Log (System Activity Sheet Properties Tabs)
In the Activity Sheets log, when you select the System Activity Sheet, the following properties tabs appear in the right pane:
- Mapped Projects tab
- Schedule tab
- History tab
The following describes the tabs listed above.
Mapped Projects tab
Toolbar options
- Assign Rate Sheet
To select Planning and Actuals specifications. You can select a rate sheet from the list and specify the project to which the rate sheet will be assigned (from the Project).
- Recost
To roll up the CBS costs (Cost Loaded), or to re-calculate all costs (Resource Loaded). It enables you to perform the cost calculations in an activity sheet, for type selected (that is, current schedule or baseline schedule).
- Refresh
To refresh the Mapped Projects tab log items.
- Find on Page
To find a particular project in the Mapped Projects tab log items.
Columns
- Project ID
- Project Name
- Project Type
- Project Start Date
- Data Date
- Schedule Type
- ETC Techniques
- Rate Sheet (Planning)
- Rate Sheet (Actuals)
Schedule tab
The Schedule tab enables you to:
- Set Frequency for
Set frequency for getting data or sending data (Set Frequency for).
- Frequency
Select the time frequency.
- Start Date
Set the start date.
- End Date
Set the end date.
History tab
The History tab enables you to see a history (the history of all events that have been performed across project sheets present in the activity sheet) of changes made on the system activity sheet.
Toolbar options
- Refresh
- Find on Page
Columns
- Action
- Requestor
- Initiated On
- Start Date
- End Date
- Status
When you select an item in the History tab, the History Details split screen appear at the bottom of the page which provides more details about the selected item.