Earned Value Manager

The Earned Value Manager enables you to do the following by using one of the nodes.

  • Perform earned value analysis corresponding to the activity sheet (System or Manual) in a shell.
  • Run the earned value analysis of cost loaded projects directly.
  • Generate reports on EVA scenarios.

The Earned Value Manager module contains the following nodes:

  • Earned Value Analysis
  • Earned Value Analysis Report

To access the Earned Value Manager module:

  1. Go to the shell tab, and switch to User mode.
  2. In the left Navigator, select Earned Value Manager.

The following provides details about each node.