3 Install and Configure the Accelerator

On your Oracle Integration instance, install the accelerator to deploy the project. Once installed, you can configure the delivered connections and integrations.

Install the Accelerator

  1. On the Oracle Integration Home page, in the Get Started section, click Browse store.
  2. Search for this accelerator:

    Oracle Primavera Cloud — Primavera P6 EPPM | Integrate Resources and Project Data

  3. After you find the accelerator, click Get on the accelerator card.

    A message confirms that the accelerator was successfully installed, and the accelerator card shows In Use.

  4. Click Configure Configure icon on the accelerator to configure its resources.

    The project workspace opens, displaying all the resources of the accelerator.

After installing the accelerator, and before you can run the integrations, you need to configure the two delivered connections which are used in each integration:

Configure the Oracle Primavera Cloud Connection

  1. In the Connections section, click Actions Actions icon next to Oracle Primavera Cloud Connection, then select Edit.
  2. In the Properties section, in the Connection URL field, enter the URL of your Oracle Primavera Cloud instance.
  3. In the Security section, do the following:
    1. In the Security policy field, select Oracle Primavera Cloud Login.
    2. In the Username field, enter the user name of your Oracle Primavera Cloud or integration user account.
    3. In the Password field, enter the password of your Oracle Primavera Cloud or integration user account.
  4. In the Access type section, select Public gateway.
  5. Click Save. If prompted, click Save again.
  6. Click Test to ensure that your connection is successfully configured. In the resulting dialog box, click Test again.
    A message confirms if your test is successful.
  7. To return to the project workspace, click Go back Back icon.

Configure the Oracle Primavera P6 EPPM Connection

  1. In the Connections section, click Actions Actions icon next to Oracle Primavera P6 EPPM Connection, then select Edit.
  2. In the Properties section, in the Connection URL field, enter the URL of your Oracle Primavera P6 EPPM instance.
  3. In the Security section, do the following:
    1. In the Security Policy field, select OAuth.
    2. In the Username field, enter the user name of the integration user account.
    3. In the Password field, enter the password of the integration user account.
  4. In the Access type section, select Public gateway.
  5. Click Save. If prompted, click Save again.
  6. Click Test to ensure that your connection is successfully configured. In the resulting dialog box, click Test again.
    A message confirms if your test is successful.
  7. To return to the project workspace, click Go back Back icon.