4 Activate and Run the Recipe

After configuring all of the connections, activate and run the integration.

Activate the Integration

Activating at the project level activates all the integrations in the project in a single step. In this case, there is only one integration, so activating at the project level is the same as activating at the integration level.

  1. In the navigation pane, select Projects.
  2. Search for this project:

    Primavera Unifier and Oracle Fusion Cloud ERP sync

  3. Hover over the project and click Activate "".
  4. In the Activate project panel, do the following:
    1. Select Project deployment.
    2. Select an appropriate Tracing level (Production, Audit, or Debug).
    3. Click the Activate button.

    A confirmation message appears.

    You can change the tracing level later by selecting Actions, and then Configure activation.

  5. Refresh the page to see the updated Activated status of the project.

Run the Integration

This recipe delivers a single integration:

  • Scheduled Unifier to Fusion ERP Projects Sync

To run the integration:

  1. In the Integrations section of the project workspace, click Actions Actions icon on the integration, then select Run.
  2. On the Configure and run page, enter values for the following schedule parameters:
    • reportName: Enter the name of the user-defined report you created in Primavera Unifier for this integration (see Configure a user defined report (UDR)).

      For example: OIC_ProjectShell_Integration_UDR_DW

    • lastProjectUpdateDate: You can specify a time stamp in UTC ( Coordinated Universal Time) format to retrieve reports from Primavera Unifier that have been created or changed or updated since this date-time stamp.

      For example: 2026-1-1 10:00:00

      We do not pass time zone information, only the full date/time information, and the report is set up to default to UTC time zone. If scheduler is active, this parameter is updated by the last time run date/time timestamp converted to UTC time zone. If this parameter is left blank, all projects from Primavera Unifier will be synchronized.

  3. Click Run and then monitor the instance to verify success.

Monitor the Integration

You can monitor instances and errors directly within the project workspace and also from the global observability pages.

Monitor from the Project

  1. In the project workspace, click Observe.
  2. Click Instances to see all runs.

    You can filter by Status (for example, Succeeded or Errored) and Time window (time range).

    Click an instance to open the activity stream, which shows step-by-step execution and faults.

  3. Use the Errors panel to review failures and take action (resubmit or discard) where available.

Monitor from Global Observability

Use global observability for cross-project monitoring of health, performance, and errors.

  1. In the navigation pane, click Observability.
  2. Click Dashboards to review instance trends, error rates, and performance across projects.