Setting up the Field Work Process Integration Pack
This chapter describes how to configure the integration pack to meet the requirements for the two-way or three-way integration. It includes the following scenarios:
•
Scenario 1: CC&B – MWM - WAM v1.9.1.x
•
Scenario 2: CC&B + MWM
•
Scenario 3: MWM + WAM v1.9.1.x
•
Scenario 4: CC&B + WAM v1.9.1.x
•
Scenario 5: MWM + WAM v2.1.x/ODM
•
Scenario 6: CCB + WAM v2.1.x/ODM
•
Scenario 7: CCB + MWM + WAM v2.1.x/ODM
This site works best with JavaScript enabled