1.6.3 Integration Process of OL and ELCM

Table 1-6 Integration Process of OL and ELCM

Process Description
Forward Init As part of loan batch process for contract marked for initiation on processing date, the system picks and processes the FWDINIT on processing date.After processing FWDINIT, the system sends a request to ELCM system (if any limits are linked to contract) for Utilization of contract amount.

After success response from the ELCM system, the system authorizes the FWDINIT process.For failure response from ELCM system, the system roll backs the FWDINIT process (after roll back contract details are logged into exception table)

Forward VAMI As part of loan batch process for contract marked for VAMI on processing date, the system picks and processes the FWDVAMI on processing date. After processing FWDVAMI, the system sends a request to ELCM system (If any limits are linked to contract) for Utilization/ De-Utilization of contract amount.

After success response from the ELCM system, the system authorizes the VAMI process. For failure response from ELCM system, the system roll backs the FWDVAMI process (after roll back contract details are logged into exception table)

Auto Liquidation and Forward Liquidation As part of loan batch process for contract marked for Liqudation on processing date, the system picks and processes the liquidation on processing date. After processing the system sends a request to ELCM system (If any limits are linked to contract) for Utilization/De- Utilization of contract amount.

After success response from the ELCM system, the system completes the liquidation process. For failure response from ELCM system, the system roll backs the liquidation process (after roll back contract details are logged into exception table).

ACCRUAL As part of loan batch process for contract marked for ACCRUAL on processing date, the system picks and processes the ACCRUAL process on processing date. After processing accrual process, the system sends a request to ELCM system (If any limits are linked to contract) for Utilization/De-Utilization of contract amount.

After success response from the ELCM system, the system authorizes the accrual process. For failure response from ELCM system, the system roll backs the ACCRUAL process (after roll back contract details are logged into exception table).

This topic contains following sub-topics: